Start-up preparation checklist
5-15
CenterMax Operating Instructions
61211-1020202
Start-up preparation checklist
Housing covers
–
Are all CMM housing covers mounted?
Power supply
–
Is the power supply connected?
–
Are the cables in perfect condition?
Compressed-air supply
–
Is the compressed-air supply connected?
–
Does the compressed-air supply have sufficient pressure?
–
Is the required pressure indicated?
Probe rack (optional)
–
Have all requirements regarding the probe rack been met?
–
Has the probe rack been installed correctly?
–
Is probe change possible without collision?
Содержание CenterMax
Страница 1: ...Operating Instructions CenterMax Coordinate measuring machine for series production...
Страница 9: ...61211 1020202 Operating Instructions Contents7 Appendix Application examples 1...
Страница 10: ...61211 1020202 Operating Instructions Contents 8...
Страница 14: ...Foreword 61211 1020202 Operating Instructions...
Страница 26: ...1 12 Introduction 61211 1020202 CenterMax Operating Instructions...
Страница 58: ...3 6 Technical data 61211 1020202 CenterMax Operating Instructions...
Страница 64: ...4 6 Transport and installation 61211 1020202 CenterMax Operating Instructions...
Страница 80: ...5 16 Preparations for start up 61211 1020202 CenterMax Operating Instructions...
Страница 100: ...6 20 Start up 61211 1020202 CenterMax Operating Instructions...
Страница 134: ...7 34 Measuring operation 61211 1020202 CenterMax Operating Instructions...
Страница 144: ...8 10 Errors and faults 61211 1020202 CenterMax Operating Instructions...
Страница 156: ...9 12 Maintenance and care 61211 1020202 CenterMax Operating Instructions...
Страница 162: ...61211 1020202 Operating Instructions Glossary 2...
Страница 164: ...61211 1020202 Operating Instructions Appendix 2...
Страница 165: ......
Страница 166: ...01 02 61211 1020202 Operating Instructions...