Foreword
61211-1020202
Operating Instructions
1
Remove probe.
2
Uncover adapter
plate receptacle.
Instructions which must be followed in
chronological order.
• Place the work-
piece ...
Instructions
•
Switch off the drives
so that ...
Instructions in warnings, e.g. danger warn-
ing.
1 Turning lever for ...
2 Metal plate with ...
Description of item numbers in a drawing
A
Adapter
B
Probe head
Description of item numbers in a drawing
Example
Description
Содержание CenterMax
Страница 1: ...Operating Instructions CenterMax Coordinate measuring machine for series production...
Страница 9: ...61211 1020202 Operating Instructions Contents7 Appendix Application examples 1...
Страница 10: ...61211 1020202 Operating Instructions Contents 8...
Страница 14: ...Foreword 61211 1020202 Operating Instructions...
Страница 26: ...1 12 Introduction 61211 1020202 CenterMax Operating Instructions...
Страница 58: ...3 6 Technical data 61211 1020202 CenterMax Operating Instructions...
Страница 64: ...4 6 Transport and installation 61211 1020202 CenterMax Operating Instructions...
Страница 80: ...5 16 Preparations for start up 61211 1020202 CenterMax Operating Instructions...
Страница 100: ...6 20 Start up 61211 1020202 CenterMax Operating Instructions...
Страница 134: ...7 34 Measuring operation 61211 1020202 CenterMax Operating Instructions...
Страница 144: ...8 10 Errors and faults 61211 1020202 CenterMax Operating Instructions...
Страница 156: ...9 12 Maintenance and care 61211 1020202 CenterMax Operating Instructions...
Страница 162: ...61211 1020202 Operating Instructions Glossary 2...
Страница 164: ...61211 1020202 Operating Instructions Appendix 2...
Страница 165: ......
Страница 166: ...01 02 61211 1020202 Operating Instructions...