Start-up log
Complete the unit and system checkout, follow the IOM
unit start-up procedures and chronicle the unit information,
temperatures and pressures during start-up. Keep this log for
future reference.
Date
(MM/YY)
Sales order no.
Job name
Unit location in building
Cabinet model no.
Cabinet serial no.
Prior to full operation
The following checks and data entries may help to minimize troubleshooting and costly system failures. Allow the unit to
run for fifteen minutes in each mode before recording data. Do NOT connect gauge lines.
Fan motor speed(s)
Antifreeze type
Temperature (F or C)
Antifreeze %
Pressures (psig or kPa)
Cooling mode
Heating mode
Return-air temperature
DB
WB
DB
Supply-air temperature
DB
WB
DB
Air temperature differential
Entering fluid temperature
Leaving fluid temperature
Fluid temperature differential
Water coil heat exchanger
(water pressure out)
Fluid pressure differential
Fluid flow rate GPM (l/s)
Compressor
Amps
Volts
Discharge line temperature
Fan motor
Amps
Volts
42
Содержание HP Series
Страница 47: ...SMART IDEAS Always the best climate for ...