EN - 35
Index
Foreword 34
Table of terms and abbreviations
36
1. Unpacking and preparing the installation
37
1.1 Package contents
37
1.2 Checking the delivery
37
1.3 Required tools and mounting material
37
2. Description and recognition
38
2.1 Operation of the air volume controller
38
2.2 Parts required for installing the air volume controller
39
3. Safety
41
3.1 Safety with regard to installation
41
3.2 Assembly instructions
42
3.3 Installation instructions
42
3.4 Warranty
43
4. Specifications
44
4.1 Technical specifications
44
4.2 Dimensions of the VM and CM
45
5. Installation
46
5.1 General
46
5.2 Installation of the optional adapters on the VMs
46
5.3 Removing/placing VM interior from/in VM
47
5.4 Installation of the VM's
48
5.4.1 Changing the air flow direction of the VM
50
5.5 Fitting the silencer
50
5.6 Installing the CM
51
5.7 Connecting cabling and power supply
52
5.7.1 Connecting mains power to the CM
53
5.7.2 Connecting cables between CM and VMs
53
5.7.3 Connecting optional control components to the CM
53
5.7.4 Connecting cables CM-connect in the AHU
54
5.7.5 Connecting cabling CM-connect per house
54
6. Installation
55
6.1 General
55
6.2 Connect to CM Embedded Webserver (CM-EW)
55
6.3 Configuring the web server
56
6.4 Setup of a connected system
58
7. Commissioning
59
7.1 General
59
7.2 Completing the commissioning procedure
59
8. Malfunctions
60
9. Maintenance
62
10. Dismantling and disposal
62
10001124369-0123-zw-zw-A4 ComfoVar Aero Installer_Service Zehnder-General_BOOK_2.indb 35
10001124369-0123-zw-zw-A4 ComfoVar Aero Installer_Service Zehnder-General_BOOK_2.indb 35
24-01-2023 11:10
24-01-2023 11:10