39
4.2 Checklist B Maintenance Works Skilled Personnel
Maintenance Works
Enter Result
−
Reviewing the ventilation plants according to DIN 1946-6 Annex E (normative) and Annex F (informative)
−
Hygiene inspection according to VDI 6022, point 5.3.2.
−
Comments for the status with informal report
−
Continuous annual pie charts on a separate sheet
No.
Parts
Annually
Result
201...
201...
201...
201...
201...
1
Ventilator / Ventilation Device
Have the components
been cleaned?
-
Ventilator
-
enthalpy
exchanger
-
air handling
cylinders of the
device
yes / no
Frost protection / thaw
setup functional?
yes / no
Is the transmission of
structure-born noise,
fixing prevented?
yes / no
Are the operation
displays functional?
yes / no
2
Electrical Engineering/
Regulation
Are the cable
connections and
terminal fixing secure?
yes / no
Are the control devices
and control units
functional?
yes / no
3
Air duct / heat insulation
Is the device cleaned
(if required)? Is the
testing in place? If
required, refer to VDI
6022 for cleaning
yes / no
Is the heat insulation
and vapour barrier in
order?
yes / no
Are the flexible
connections between
the device and the air
duct functional
?
yes / no
4
Ventilator, ventilation device,
Filter, filter status
Are the stipulated filter
class adhered to?
yes / no
5
Ventilator / ventilation device
and heat-producing appliance
if available
Is the safety device
with heat-producing
appliance functional?
yes / no
6
Exhaust air/supply air-
passage
Seat and lock given?
yes / no
Is the stipulated filter
class adhered to?
yes / no
Filter, filter status ok?
yes / no
Is the air quantity
according to the log?
yes / no
7
Overflow air passages
Is there is free cross-
section?
yes / no
No transmission of
structure-born noise
and transmission of
airborne sound?
yes / no
Содержание ComfoAir 70
Страница 1: ...Version 1 2_10 2014 EN ComfoAir 70 Operating Manual and Assembly Instruction for User and Installer...
Страница 2: ......
Страница 32: ...32 3 5 2 Assembly Template measured Figure is not scaled...
Страница 43: ......