User Manual 3PH HYD5000-HYD20000-ZSS
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1. of 16/03/2021 - Application: GID
68/138
3.
Switch on the Inverter and Battery and check that the total power value (Pt) is in line with the
value shown on the inverter's display.
Checking the Meter on Production
In case of
meter on production
, repeat the above steps:
1.
Check the Power Factor as described in the previous case.
2.
The sign of the Pa, Pb, and Pc powers must match
3.
Switch on the Inverter Hybrid and check that the total power value (Pt) is in line with the value
shown on the inverter's display.