USER AND MAINTENANCE MANUAL
30
ELECTROPNEUMATIC VALVE
MZD100
Pull out the needle with the help of a smooth plier;
9
Unscrew the lock bush with tubular spanner, then remove it
from the valve body;
Check the wear of the lock bush O-ring (POS. 8-9-11) and of
the gasket (POS. 10) and, if it is necessary, replace it. Always
grease* the new O-rings before assembling them.
10
11
POS.8
POS.9
*Use silicon-based grease or oil
specific for O-rings.
For any questions or information
contact the Zator company.
POS.10
POS.11
Extract the spring;
5
Содержание MZD100
Страница 1: ...elettropneumatic valve USERAND MAINTENANCE MANUAL gluing solutions MZD100...
Страница 6: ......
Страница 7: ...USERAND MAINTENANCEMANUAL elettropneumatic valve MZD100...
Страница 42: ...42 USER AND MAINTENANCE MANUAL ELECTROPNEUMATIC VALVE MZD100 NOTE...
Страница 43: ......