background image

Operating and assembly instructions 

Z200 / Z300  

25

Z200 / Z300

Stabilisers

2.2 m

44455

Base plates

0.30 m

44459

Z200-300-AA-RC4_EN.indd   25

Z200-300-AA-RC4_EN.indd   25

28.02.2008   10:21:53

28.02.2008   10:21:53

Содержание Z200

Страница 1: ...Assembly and usage instructions www zarges de Z200 Z300 mobile scaffold towers Z200 300 AA RC4_EN indd 1 Z200 300 AA RC4_EN indd 1 28 02 2008 10 20 43 28 02 2008 10 20 43...

Страница 2: ......

Страница 3: ...ffold 8 2 3 Further applicable safety instructions 8 2 4 Technical specifications 8 2 5 General assembly specifications 9 2 6 Basic measurements 12 2 7 Identification 13 2 8 Parts list incl ballasting...

Страница 4: ...2360 Weilheim Internet http www zarges de 1 3 Construction type approval The scaffolds addressed below were inspected by 1 4 Warranty The scope period and form of the warranty are established in the m...

Страница 5: ...ve damages 1 7 Proper usage The scaffolds listed in these operating and assembly instructions may only be used as scaffolds according to the regulations of EN 1004 and the version overview of these op...

Страница 6: ...ight of max 4 40 m above the ground The distance between the other platforms may be at most 4 m The platforms must be at least 1 70 m apart 8 During the assembly and disassembly of the scaffold platfo...

Страница 7: ...wind protected area if there are wind strengths above 6 according to the Beaufort scale in case of an oncoming storm and when work is complete and protected against tipping with other suitable measur...

Страница 8: ...al specifications Z200 folding scaffold 0 7 m 1 5 m Approved according to EN 1004 Scaffold group 3 Permissible load according to scaffold group 3 200 kg m Total load of the scaffold maximum 210 kg Loa...

Страница 9: ...c package Fig 5 Fig 6 4 Assembly of swivel castors with shafts on the chassis beams base plates are included in the basic package Fig 7 Fig 8 5 Assembly of diagonal braces The first diagonals always b...

Страница 10: ...max 0 5m Fig 19 Fig 20 10 Assembly of toe boards lengthwise board crosswise board 1 2 8 1 Assembly of railings Z200 For Fig 15 Railings for intermediate platform For Fig 16 Railings for working platf...

Страница 11: ...ning the scaffold After the scaffold has been as sembled it must be aligned us ing a spirit level If the scaffold should be moved to its usage location only after assembly its alignment must absolutel...

Страница 12: ...0 2800 K 1500 700 K B 1500 700 1500 K B C 1500 700 1500 K B C D 1500 700 1500 3000 2800 Z300 0 7 m 2 0 m A 2000 700 A B 2000 700 1650 A B C 2000 700 1650 A B C D 2000 700 1650 3000 3300 A B C D E 2000...

Страница 13: ...assembly instructions Z200 Z300 13 Z200 Z300 2 7 Identification Item no Type plate Max platform height Load max EAN code Z200 300 AA RC4_EN indd 13 Z200 300 AA RC4_EN indd 13 28 02 2008 10 20 59 28 02...

Страница 14: ...3 3 3 3 3 7 00 48402 2 1 3 4 5 7 7 5 7 7 9 00 48403 2 2 4 2 2 2 2 2 2 approx m Order no 44400 44404 44407 44405 44413 44436 44445 44441 44421 44411 44451 44455 44459 44460 4 Z300 0 7 2 0 2 55 44509 1...

Страница 15: ...parts Slip in frame 2 00 m Slip in frame 1 00 m Folding unit Platform with access way Crosswise toe board Lengthwise toe board Diagonal brace Horizontal brace Stabilisers Chassis beams Railings Z200...

Страница 16: ...ight 2 85 m Weight 83 1 kg Order no 48540 Scaffold comb Module A B C Working height approx 6 85 m Scaffold height 5 95 m Platform height 4 85m Weight 111 2 kg Order no 48541 Scaffold comb Module A B C...

Страница 17: ...ht 3 70 m Platform height 2 60 m Weight 84 9 kg Order no 48590 Scaffold comb Module K B C Working height approx 6 60 m Scaffold height 5 70 m Platform height 4 60 m Weight 113 0 kg Order no 48591 Scaf...

Страница 18: ...3 Z300 Mobile scaffold tower 0 7 2 0 Scaffold comb Platform height Module A 0 90 m Working height Weight approx 2 90 m 27 1 kg Scaffold height Order no 1 75 m 44500 Scaffold comb Platform height Modul...

Страница 19: ...9 60 m Weight 201 7 kg Order no 44593 Scaffold comb Platform height Module A 0 70 m Working height Weight approx 2 70 m 31 1 kg Scaffold height Order no 1 50 m 44509 Scaffold comb Platform height Mod...

Страница 20: ...is forbidden to extend the platform height by using ladders crates or other equipment 7 Tools and materials may only be handed upwards Here the weight of the tools and materials must always be taken...

Страница 21: ...of weather During transport to or from the storage location the scaffold components must be secured against slipping and bumping as well as falling down When loading the scaffold components may not be...

Страница 22: ...tight fit If you would like information or if you have special problems that are not treated in sufficient detail in these operating and assembly instructions you can request the required information...

Страница 23: ...arts Platform with flap 1 5 m 44435 2 0 m 44436 Railings Z300 2 0 m 44413 Folding unit 1 5 m 44468 2 0 m 44404 Slip in frame 1 0 m 44407 2 0 m 44405 Basic frame 1 75 m 44400 Z200 300 AA RC4_EN indd 23...

Страница 24: ...44445 Lengthwise board 1 5 m 44440 2 0 m 44441 Diagonal brace 1 5 m 44420 2 0 m 44421 Horizontal brace 1 5 m 44410 2 0 m 44411 Chassis beams 1 50 m alu 44450 1 65 m steel 44451 Z200 300 AA RC4_EN ind...

Страница 25: ...perating and assembly instructions Z200 Z300 25 Z200 Z300 Stabilisers 2 2 m 44455 Base plates 0 30 m 44459 Z200 300 AA RC4_EN indd 25 Z200 300 AA RC4_EN indd 25 28 02 2008 10 21 53 28 02 2008 10 21 53...

Страница 26: ...t disk 10 0 kg 44460 Swivel castors 150 mm No pieces 44454 VE 4 pcs 44444 Slip in pipe of alu 0 6 m 44449 Wall anchor 1 0 m 44461 Swivel castors 125 mm No pieces 44453 VE 4 pcs 44433 Z200 300 AA RC4_E...

Страница 27: ...Operating and assembly instructions Z200 Z300 27 Z200 Z300 Entry arm steel 0 3 m 44456 Z200 300 AA RC4_EN indd 27 Z200 300 AA RC4_EN indd 27 28 02 2008 10 21 54 28 02 2008 10 21 54...

Страница 28: ...Operating and assembly instructions Z200 Z300 28 NOTES Z200 300 AA RC4_EN indd 28 Z200 300 AA RC4_EN indd 28 28 02 2008 10 21 54 28 02 2008 10 21 54...

Страница 29: ...Operating and assembly instructions Z200 Z300 29 Z200 Z300 NOTES Z200 300 AA RC4_EN indd 29 Z200 300 AA RC4_EN indd 29 28 02 2008 10 21 55 28 02 2008 10 21 55...

Страница 30: ...Operating and assembly instructions Z200 Z300 30 NOTES Z200 300 AA RC4_EN indd 30 Z200 300 AA RC4_EN indd 30 28 02 2008 10 21 55 28 02 2008 10 21 55...

Страница 31: ...Operating and assembly instructions Z200 Z300 31 Z200 Z300 NOTES Z200 300 AA RC4_EN indd 31 Z200 300 AA RC4_EN indd 31 28 02 2008 10 21 55 28 02 2008 10 21 55...

Страница 32: ...Operating and assembly instructions Z200 Z300 32 NOTES Z200 300 AA RC4_EN indd 32 Z200 300 AA RC4_EN indd 32 28 02 2008 10 21 55 28 02 2008 10 21 55...

Страница 33: ...Operating and assembly instructions Z200 Z300 33 Z200 Z300 NOTES Z200 300 AA RC4_EN indd 33 Z200 300 AA RC4_EN indd 33 28 02 2008 10 21 56 28 02 2008 10 21 56...

Страница 34: ...Operating and assembly instructions Z200 Z300 34 NOTES Z200 300 AA RC4_EN indd 34 Z200 300 AA RC4_EN indd 34 28 02 2008 10 21 56 28 02 2008 10 21 56...

Страница 35: ...Z200 300 AA RC4_EN indd 35 Z200 300 AA RC4_EN indd 35 28 02 2008 10 21 56 28 02 2008 10 21 56...

Страница 36: ...No 291291 EN No 540291291000 Z200 300 AA RC4_EN indd 36 Z200 300 AA RC4_EN indd 36 28 02 2008 10 21 56 28 02 2008 10 21 56...

Отзывы: