4. INSTALLATION
SYNTHESIS GAS
15
4.9. Checking before starting work
After completing installation of the unit a series of checks must be
carried out, listed as follows:
-
check that the various disassembled parts have been assembled.
-
Check the power cable.
-
Check that the control panel is working.
-
Check the integrity of the jointing for gas supply and exhaust tubes.
-
Check that the apertures for ventilating the room are adequate.
-
Check the nominal capacity of the oven while it is functioning at the exit
point of the solenoid valve.
-
If present, check that the ventilation hood is working
.
Содержание SYNTHESIS 08/50 V PW GAS
Страница 2: ......
Страница 38: ......
Страница 45: ...SYNTHESIS 08 50 V PW GAS C 1 110 IMPI0138 ...
Страница 46: ...SYNTHESIS 08 50 V PW GAS C 2 ...
Страница 51: ...SYNTHESIS 08 50 V PW GAS ...
Страница 52: ...SYNTHESIS 08 50 V PW GAS ...
Страница 55: ...SYNTHESIS 08 50 V PW GAS ...
Страница 56: ...SYNTHESIS 08 50 V PW GAS ...
Страница 59: ...SYNTHESIS 08 50 V PW GAS ...
Страница 60: ......
Страница 64: ...SYNTHESIS BM A B ...