
– 7 –
6. Operating the ML2-200
Communication Conversion
Using the ML2-200, Colormetry hardness monitors connected to DS-NET networks
can also be connected to M-NET networks.
DS-NET Compatible Equipments
Equipment Format ROM
version
Colormetry
hardness monitor
CMU-224HE
DE12-1040 and later
NOTE
If the message “Comm F: F090” is displayed on the screen of the Colormetry
hardness monitor, it is possible that communication is not taking place between
ML2-200 and Colormetry. In such a case, ensure that power is being supplied
to the ML2-200 and that DS-NET lines have been correctly connected.
WARNING
When inspecting wiring, turn off the main power for the equipment known to be
operating incorrectly. Follow the instructions given in the relevant operation
manuals regarding the procedure for eliminating the causes of alarms and
system notices. Any incorrect operation can lead to serious accidents.
When performing repairs, be sure to correctly follow the sequence described in
the operation manual. If the prescribed repair operations do not successfully
eliminate the problem, contact a MIURA sales office, your local dealer, or a
service center. Operations other than those specified may cause personal
injury.