![Z Boiler Miura ML2-200 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/z-boiler/miura-ml2-200/miura-ml2-200_operation-manual_3070172007.webp)
– 5 –
4. Basic Precautions
Items to Check before Use
Check that the ML2-200 is installed correctly as described in
Section 5: Pre-operation Inspection
. If any installation-related
problem is identified, contact a MIURA sales office immediately.
One specific person must be placed in charge of the ML2-200.
Said person must carefully read all of the safety-related precautions contained
within this operation manual, and once they have all been fully understood, must
operate and maintain the ML2-200 in accordance with them.
Do Not Customize or Modify
Customization or modification not recommended by MIURA (such as connecting to
ancillary equipment) may affect safety. Contact MIURA maintenance personnel
before customizing or modifying. Note MIURA will accept no responsibility for the
results of unapproved modification.
When Reselling or Relocating
Proper installation and ancillary equipment are necessary when using the ML2-200.
Be sure to contact a MIURA sales office, your local dealer, or a service center when
moving or reselling the ML2-200. Inappropriate installation or unsuitable ancillary
equipment may cause personal injury.
This operation manual must be read by all persons using the ML2-200. If reselling,
this manual must also be provided to the new user.
WARNING
All of the safety-related precautions contained within this operation manual
must be observed whenever operating the ML2-200 Water-processing
Communication Conversion Box.
Failure to observe these precautions may cause personal injuries.
6