Z Boiler Miura ML2-200 Скачать руководство пользователя страница 5

 

– 3 – 

 

 

2. Overview   

Features 

‹

  Using the ML2-200 Water-processing Communication Conversion Box, Colormetry 

hardness monitors connected to DS-NET networks can also be connected to M-NET 
networks  

 

Main Functions   

‹

 Communication 

conversion  

This communication conversion box controls equipments connected to DS-NET 
and also facilitates communication with the maintenance branch.   

 

System Configuration   

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

‹

  This diagram shows four boilers for demonstration purposes only.   

 

Boilers 

MAIFLEX 

MIURA Maintenance 
branch 

Colormetry 
hardness 
monitor 

DS-NET 

M-NET

ML2-200 

Содержание Miura ML2-200

Страница 1: ...l Code No S855 080 3400 Ensure that this operation manual is fully read and observed by all persons working with the water processing communication conversion box Store this operation manual in a loca...

Страница 2: ...bes the purpose functionality pre operation inspection makeup and operation method of the ML2 200 Water processing Communication Conversion Box Note regarding product guarantee This operation manual c...

Страница 3: ...verview 3 Features 3 Main Functions 3 System Configuration 3 3 Device Makeup 4 Overall View 4 Control Box Interior 4 4 Basic Precautions 5 5 Pre operation Inspection 6 6 Operating the ML2 200 7 Commun...

Страница 4: ...s injuries or death of the user Failure to use the ML2 200 correctly may lead to injury of the user or to property damage Important information to prevent malfunction and ensure efficient work or info...

Страница 5: ...o M NET networks Main Functions Communication conversion This communication conversion box controls equipments connected to DS NET and also facilitates communication with the maintenance branch System...

Страница 6: ...Device Makeup Overall View Control Box Interior DIP switch Fuse Switching power supply Communication board Rotary switch Terminal block Varistor assembly S R FG F F N2 N1 N0 N2 N1 N0 FG FG S1 S2 XD4 b...

Страница 7: ...safety Contact MIURA maintenance personnel before customizing or modifying Note MIURA will accept no responsibility for the results of unapproved modification When Reselling or Relocating Proper insta...

Страница 8: ...hared with other equipments Furthermore ensure that the power supply can remain constantly turned on z Confirm whether the device has been grounded At the very least D class grounding with ground resi...

Страница 9: ...s being supplied to the ML2 200 and that DS NET lines have been correctly connected WARNING When inspecting wiring turn off the main power for the equipment known to be operating incorrectly Follow th...

Страница 10: ...midity Range RH 20 to 90 non condensing Installation Style Indoor wall mounting Weight kg 2 0 External Dimensions mm 210 W 60 D 250 H NOTE In cases where this communication conversion box and other DS...

Отзывы: