Z Boiler Miura ML2-200 Скачать руководство пользователя страница 6

 

– 4 – 

 

 

3. Device Makeup 

Overall View 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Control Box Interior 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DIP switch

Fuse 

Switching 
power 
supply 

Communication 
board 

Rotary switch

Terminal 
block 

Varistor 
assembly

S

R

FG

F

F

N2    N1    N0    N2    N1    N0    FG

FG      S1      S2

XD4 board

Содержание Miura ML2-200

Страница 1: ...l Code No S855 080 3400 Ensure that this operation manual is fully read and observed by all persons working with the water processing communication conversion box Store this operation manual in a loca...

Страница 2: ...bes the purpose functionality pre operation inspection makeup and operation method of the ML2 200 Water processing Communication Conversion Box Note regarding product guarantee This operation manual c...

Страница 3: ...verview 3 Features 3 Main Functions 3 System Configuration 3 3 Device Makeup 4 Overall View 4 Control Box Interior 4 4 Basic Precautions 5 5 Pre operation Inspection 6 6 Operating the ML2 200 7 Commun...

Страница 4: ...s injuries or death of the user Failure to use the ML2 200 correctly may lead to injury of the user or to property damage Important information to prevent malfunction and ensure efficient work or info...

Страница 5: ...o M NET networks Main Functions Communication conversion This communication conversion box controls equipments connected to DS NET and also facilitates communication with the maintenance branch System...

Страница 6: ...Device Makeup Overall View Control Box Interior DIP switch Fuse Switching power supply Communication board Rotary switch Terminal block Varistor assembly S R FG F F N2 N1 N0 N2 N1 N0 FG FG S1 S2 XD4 b...

Страница 7: ...safety Contact MIURA maintenance personnel before customizing or modifying Note MIURA will accept no responsibility for the results of unapproved modification When Reselling or Relocating Proper insta...

Страница 8: ...hared with other equipments Furthermore ensure that the power supply can remain constantly turned on z Confirm whether the device has been grounded At the very least D class grounding with ground resi...

Страница 9: ...s being supplied to the ML2 200 and that DS NET lines have been correctly connected WARNING When inspecting wiring turn off the main power for the equipment known to be operating incorrectly Follow th...

Страница 10: ...midity Range RH 20 to 90 non condensing Installation Style Indoor wall mounting Weight kg 2 0 External Dimensions mm 210 W 60 D 250 H NOTE In cases where this communication conversion box and other DS...

Отзывы: