Z Boiler Miura ML2-200 Скачать руководство пользователя страница 4

 

– 2 – 

 

 

1. Terminology 

 

The following indicators are used in this manual to ensure safe and efficient work. 
Ensure that you fully understand the meaning of each and use the ML2-200 
accordingly.  

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 

 

 
 

 

 
 
 
 

Failure to use the ML2-200 correctly 
may lead to serious injuries or death of 
the user. 

Failure to use the ML2-200 correctly 
may lead to injury of the user or to 
property damage. 

Important information to prevent 
malfunction and ensure efficient work, 
or information that will be useful during 
operation of the ML2-200. 

The number in this symbol 
indicates the relevant page.   

This symbol indicates 
forbidden actions.   
Specific details are presented 
with the symbol. 

 

WARNING

 

CAUTION

 

NOTE

 

Meaning of symbols

Содержание Miura ML2-200

Страница 1: ...l Code No S855 080 3400 Ensure that this operation manual is fully read and observed by all persons working with the water processing communication conversion box Store this operation manual in a loca...

Страница 2: ...bes the purpose functionality pre operation inspection makeup and operation method of the ML2 200 Water processing Communication Conversion Box Note regarding product guarantee This operation manual c...

Страница 3: ...verview 3 Features 3 Main Functions 3 System Configuration 3 3 Device Makeup 4 Overall View 4 Control Box Interior 4 4 Basic Precautions 5 5 Pre operation Inspection 6 6 Operating the ML2 200 7 Commun...

Страница 4: ...s injuries or death of the user Failure to use the ML2 200 correctly may lead to injury of the user or to property damage Important information to prevent malfunction and ensure efficient work or info...

Страница 5: ...o M NET networks Main Functions Communication conversion This communication conversion box controls equipments connected to DS NET and also facilitates communication with the maintenance branch System...

Страница 6: ...Device Makeup Overall View Control Box Interior DIP switch Fuse Switching power supply Communication board Rotary switch Terminal block Varistor assembly S R FG F F N2 N1 N0 N2 N1 N0 FG FG S1 S2 XD4 b...

Страница 7: ...safety Contact MIURA maintenance personnel before customizing or modifying Note MIURA will accept no responsibility for the results of unapproved modification When Reselling or Relocating Proper insta...

Страница 8: ...hared with other equipments Furthermore ensure that the power supply can remain constantly turned on z Confirm whether the device has been grounded At the very least D class grounding with ground resi...

Страница 9: ...s being supplied to the ML2 200 and that DS NET lines have been correctly connected WARNING When inspecting wiring turn off the main power for the equipment known to be operating incorrectly Follow th...

Страница 10: ...midity Range RH 20 to 90 non condensing Installation Style Indoor wall mounting Weight kg 2 0 External Dimensions mm 210 W 60 D 250 H NOTE In cases where this communication conversion box and other DS...

Отзывы: