Section 3: Filling the Bulk Odorant Tank
Refilling the Bulk Odorant Tank
CAUTION:
Odorant has a very strong odor, which if allowed
to escape into the atmosphere may cause
problems in the local community. Take necessary
precautions when filling an odorant storage tank
to assure that the local community is not
disrupted during the filling process. Verify that
the entire system has no pressure in it before
beginning. Additionally all personnel should wear
protective clothing, and use equipment as
recommended by the chemical manufacturer
during this time. If you are uncertain about any
aspect of the odorant itself, you should contact
the manufacturer of your chemical prior to
proceeding.
1.
Ensure the Z-100 controller is powered off by
placing the power switch in the OFF position,
or by using the navigation switch to place the
SYSTEM in OFF mode.
2. Verify correct position of valves before begin-
ning, Figure 6.
Closed: V10, V11, V13
3. Connect a line from V11 to a flare or vapor
recovery device, and open V11.
4. Attach odorant supply to V10, open V10, and
begin transferring odorant to the bulk tank.
CAUTION:
Fill tank to a maximum level of 80% of the tank
capacity. Stay below red keep-out zone.
• The tank level indicator will not start to rise until
approximately 0.5 gallons of odorant is in the
tank.
• 1 gallon is approximately the thin line above the
fitting.
• 2.5 gallons is approximately the next thick
line below the red keep-out.
• 4 gallons is about where the red diagonal
keep-out mark starts.
5. Close V10 and V11, and remove odorant
transfer equipment, and line to flare or vapor
recovery device
6. Open V13 until the storage tank pressure is
10 psig.
7. If powered OFF, power ON the Z-100 controller
by moving the power switch to the ON position.
Restart the system using the navigation switch.
Note:
If resume on power up setting is enabled,
the system will automatically restart upon power up
Figure 7
Z-100
Pulse Input
(By Customer)
6000
Pump
Pipeline
V18
V17
NJEX STORAGE TANK
ODORANT SIGHTGLASS
PROBE ASSEMBLY
(Option)
V8
Actuation Gas
Filter
610G ENCLOSURE
Timer / Controller
V10
V11
V13
S Y S T E M S
Gas Supply
50-60 psi
(345 - 415 kPa)
By Customer