Yunca Gas LEEDZ Скачать руководство пользователя страница 17

Revised 04-08-10 

 

YUNCA Leedz FS Fuzzy Feb 2010 

 

 

 

Page 17 of 19

APPENDIX A 

 

PARTS LIST – LEEDZ FS (FuzzyLogic): 

 
PART NO. 

 

PART NAME 

 
 

 

 

 

 

6601 

Rear Burner - SIT  

6699L 

Front Burner – Furi 316 

6602A 

Pilot assembly 

6598RF 

Flame rod lead (LFS / Fuzion) 

6598SF 

Electrode lead (LFS / FUZiON) 

6680* 

Cross ignition channel (LPG/NAT) 

6600A 

Control Valve BK368 

6701R 

Remote control hand piece (Fuzzy Logic) 

6702 

Battery Box 

1955 

3 position rocker switch 

6699 

Fan only (unwired) QLZ06/1200 A49  

6624G 

Fan assembly - complete 

 
6611G 

Otago Bay Log Set assembly 

6611C 

 Logset twig   

 
88**LFzR 

 Right side panel (State Colour) 

88**LFzL 

 Left side panel (State Colour) 

 

83**LF2 

 Top panel (State Colour) 

89**LF2 

 Main door (State Colour) 

8106LF  

 Front Grill 

 
1608LF 

Leedz FS Door rope 

1610LFF 

Leedz FS Front door glass 

1610LFS 

Leedz FS Side door glass 

1611LFF 

Leedz FS Front glass packing 

1611LFS 

Leedz FS Side glass packing 

 

 

 

 
 
 

APPENDIX B 

 

INJECTOR SIZE: 

 

 

GAS TYPE 

 

FRONT BURNER 

 

BACK BURNER 

 
NATURAL 
 

 
2.3mm diameter 

 
2.3mm diameter 

 
L.P.G.  
 

 
 1.15mm diameter 

 
1.15mm diameter 

 

Содержание LEEDZ

Страница 1: ...Fuzzy Feb 2010 Page 1 of 19 LEEDZ FUZZY LOGIC control FREESTANDING GAS HEATER FEBRUARY 2010 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions should be stored in a convenient...

Страница 2: ...CONTROL AUTO TIMER 8 10 MANUAL CONTROL OPERATION 11 MAINTENANCE DOOR REMOVAL GLASS REPLACEMENT 11 GLASS CLEANING DOOR ROPE REPLACEMENT 12 BATTERY BACK UP 12 SERVICE INSPECTION AND CLEANING 13 GAS CON...

Страница 3: ...k controls for added peace of mind We highly recommend the use of the two speed fan boost on the fire for greater heating efficiency Should power not be available for any reason battery back up throug...

Страница 4: ...fitted When the appropriate position has been selected the unit must be bolted to the floor to ensure that the unit remains upright in the event of an earthquake or similar Fig 1 below If the heater...

Страница 5: ...case the length of the flue shall not be less than 3 metres from the top of the appliance flue spigot 2 When loose fill insulation is used in the adjacent ceiling space maintain clearance between the...

Страница 6: ...below Fig 3 and comply with NZS 5261 AG601 This is to ensure adequate air circulation around the heater and avoid heat damage to wall coverings Note If walled surface is non combustible i e brick or...

Страница 7: ...d be tested for leaks before operating the heater TO CHECK GAS PRESSURE 1 Remove the front plinth cover two screws at top of cover 2 Test point can be seen on the left side of the control box 3 Slacke...

Страница 8: ...Revised 04 08 10 YUNCA Leedz FS Fuzzy Feb 2010 Page 8 of 19 LEEDZ INFRA RED REMOTE CONTROL with AUTO TIMER N B DO NOT LEAVE THE REMOTE CONTROL ON TOP OF YOUR FIRE...

Страница 9: ...our Yunca Fuzzy Logic control fire HINT The two speed fan is designed to quickly transfer heat around the room and ensures the most economic gas use The three position switch HIGH OFF LOW is located o...

Страница 10: ...ou will see the AUTO symbol display on the LCD screen of the remote control unit IMPORTANT Press AUTO SET button again to cancel the auto feature or the fire will continue to operate to the automatic...

Страница 11: ...ove the front door as described above and place front down on a soft surface 2 Remove the two side glass retainers by taking out the three bolts in each one 3 Remove the bottom front glass retainer by...

Страница 12: ...page 2 Remove the existing gasket and clean the channel of all loose material 3 Lay a thin bed of gasket cement PVA glue around the length of the channel 4 Lay the gasket in the channel ensuring the...

Страница 13: ...g it up and out Brush it gently over a newspaper and carefully place it out of the way 3 The bark tray can be removed by lifting its feet over the bottom gasket retainer and pulling it straight out wi...

Страница 14: ...1 Remove front cover 2 Disconnect the wiring from switch 3 The earth wire must be unplugged and the plastic conduit adaptor removed from its retaining bracket 4 Disconnect earth wire from control valv...

Страница 15: ...to replace Pilot Set or drill the injector Nozzle diameter LPG 0 35 mm NG 0 55 mm Replace POSSIBLE CAUSE AC Power IS unplugged or loose or the fuse has a short Battery power is too low when using DC p...

Страница 16: ...he terminals have loosened Valve M has a failure or Nozzle of Valve M is blocked Front Control Board has a failure Remote Control Unit has a failure The wire set has a failure or the terminals have lo...

Страница 17: ...ition rocker switch 6699 Fan only unwired QLZ06 1200 A49 6624G Fan assembly complete 6611G Otago Bay Log Set assembly 6611C Logset twig 88 LFzR Right side panel State Colour 88 LFzL Left side panel St...

Страница 18: ...r any other indirect incidental cause are not covered by this warranty This warranty is void if the recommended service schedule is not implemented and carried out by a suitably qualified person as su...

Страница 19: ...urchased Installed By Date Designed and Manufactured by Yunca Gas Dunedin PO Box 500 DUNEDIN 9054 Telephone 03 488 4342 Email dunedin yunca co nz Cut along here This section must be completed and retu...

Отзывы: