MANUAL CONTROL PANEL OPERATION 

 

 

 

 
 
 
 
 
 
 
 
 

 
 
 

 

MAINTENANCE

 

 

A qualified service person should conduct an annual inspection and undertake any maintenance 
required on your 

LEEDZ

 (Fuzzy Logic control). Its’ venting and installation must be checked to 

keep it running safely and efficiently.  

 

REMOVING THE FRONT DOOR 

 

Note:

  The door can only be removed after the heater has been turned off for long enough so 

that the door has cooled to touching temperature.  

 

1. First the side panels must be removed, to do this grip panel at its base and pull out. The panel 

should be swung out to about 30 degrees and then pulled down to release the locating pins in 
its top.   

 

2. This will expose the restraining latches at each side. To open these latches lift the butterfly 

grip forward and twist it through 180 degrees. Ensure that the latch hook is clear of the door 
frame. 

 

3. The front door can now be removed by griping it by its back bottom corners and pulling it 

straight back and out towards you. 

     Note: It is important not to spread the sides out any further than is necessary to remove door, 

as this may damage the enamel coating on the door. 

 

REMOVING THE GLASS FOR REPLACEMENT 

1. Remove the front door as described above, and place front down on a soft surface. 
2. Remove the two side glass retainers by taking out the three bolts in each one. 
3. Remove the bottom front glass retainer by taking out the four screws along the base of the 

door. 

4. To remove the front glass place one hand under it and lift it up and out of the doorframe. 
5. Remove the side glasses 
6. New glass (1610LFF, 1610LFS) and thermotape seal (1611LFF, 1611LFS) can be ordered 

through your YUNCA agent. 

    Note: Only recommended heat resistant glass may be fitted. 
7. Place replacement glass in position in the reverse order of removal, i.e. Side glass should be 

placed in position before front glass. 

8. Replace side and bottom glass retainers with their respective bolts and screws. 
    Note: Tighten the screws and bolts alternately, do not over tighten to avoid damaging glass. 

Should the remote control be mislaid or damaged, your fire 
can be operated using the 

control panel on the front of the 

fire

, (Fig 4) located on the front panel. 

 
Press and hold the 

POWER 

button to light the fire (starts on 

high). 
 
Press again to reduce to medium, and again to reduce to 
low. 
A further press of the power button will turn the fire off. 
 
The 

PWR

 light will flash if battery is low. 

The 

AUTO

 light will flash (when the fire is off) as a reminder that the timer has been activated.  

 

 
IR receiver              Power 
 

Auto setting on       Power on &  
(indicator) 

        Battery low 

(indicator) 

FIG 4

 

Содержание LEEDZ

Страница 1: ...Fuzzy Feb 2010 Page 1 of 19 LEEDZ FUZZY LOGIC control FREESTANDING GAS HEATER FEBRUARY 2010 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions should be stored in a convenient...

Страница 2: ...CONTROL AUTO TIMER 8 10 MANUAL CONTROL OPERATION 11 MAINTENANCE DOOR REMOVAL GLASS REPLACEMENT 11 GLASS CLEANING DOOR ROPE REPLACEMENT 12 BATTERY BACK UP 12 SERVICE INSPECTION AND CLEANING 13 GAS CON...

Страница 3: ...k controls for added peace of mind We highly recommend the use of the two speed fan boost on the fire for greater heating efficiency Should power not be available for any reason battery back up throug...

Страница 4: ...fitted When the appropriate position has been selected the unit must be bolted to the floor to ensure that the unit remains upright in the event of an earthquake or similar Fig 1 below If the heater...

Страница 5: ...case the length of the flue shall not be less than 3 metres from the top of the appliance flue spigot 2 When loose fill insulation is used in the adjacent ceiling space maintain clearance between the...

Страница 6: ...below Fig 3 and comply with NZS 5261 AG601 This is to ensure adequate air circulation around the heater and avoid heat damage to wall coverings Note If walled surface is non combustible i e brick or...

Страница 7: ...d be tested for leaks before operating the heater TO CHECK GAS PRESSURE 1 Remove the front plinth cover two screws at top of cover 2 Test point can be seen on the left side of the control box 3 Slacke...

Страница 8: ...Revised 04 08 10 YUNCA Leedz FS Fuzzy Feb 2010 Page 8 of 19 LEEDZ INFRA RED REMOTE CONTROL with AUTO TIMER N B DO NOT LEAVE THE REMOTE CONTROL ON TOP OF YOUR FIRE...

Страница 9: ...our Yunca Fuzzy Logic control fire HINT The two speed fan is designed to quickly transfer heat around the room and ensures the most economic gas use The three position switch HIGH OFF LOW is located o...

Страница 10: ...ou will see the AUTO symbol display on the LCD screen of the remote control unit IMPORTANT Press AUTO SET button again to cancel the auto feature or the fire will continue to operate to the automatic...

Страница 11: ...ove the front door as described above and place front down on a soft surface 2 Remove the two side glass retainers by taking out the three bolts in each one 3 Remove the bottom front glass retainer by...

Страница 12: ...page 2 Remove the existing gasket and clean the channel of all loose material 3 Lay a thin bed of gasket cement PVA glue around the length of the channel 4 Lay the gasket in the channel ensuring the...

Страница 13: ...g it up and out Brush it gently over a newspaper and carefully place it out of the way 3 The bark tray can be removed by lifting its feet over the bottom gasket retainer and pulling it straight out wi...

Страница 14: ...1 Remove front cover 2 Disconnect the wiring from switch 3 The earth wire must be unplugged and the plastic conduit adaptor removed from its retaining bracket 4 Disconnect earth wire from control valv...

Страница 15: ...to replace Pilot Set or drill the injector Nozzle diameter LPG 0 35 mm NG 0 55 mm Replace POSSIBLE CAUSE AC Power IS unplugged or loose or the fuse has a short Battery power is too low when using DC p...

Страница 16: ...he terminals have loosened Valve M has a failure or Nozzle of Valve M is blocked Front Control Board has a failure Remote Control Unit has a failure The wire set has a failure or the terminals have lo...

Страница 17: ...ition rocker switch 6699 Fan only unwired QLZ06 1200 A49 6624G Fan assembly complete 6611G Otago Bay Log Set assembly 6611C Logset twig 88 LFzR Right side panel State Colour 88 LFzL Left side panel St...

Страница 18: ...r any other indirect incidental cause are not covered by this warranty This warranty is void if the recommended service schedule is not implemented and carried out by a suitably qualified person as su...

Страница 19: ...urchased Installed By Date Designed and Manufactured by Yunca Gas Dunedin PO Box 500 DUNEDIN 9054 Telephone 03 488 4342 Email dunedin yunca co nz Cut along here This section must be completed and retu...

Отзывы: