ZERO CLEARANCE GAS FLUE KIT (3.6m): INSTALLATION INSTRUCTIONS 

 

Yunca Gas ALLURE OPEN FIRE 630, 730 (

150mm dia flue

) 930 (

200mm dia flue

This flue kit has been manufactured in accordance with NZS 5261:2003. To ensure safety this flue kit must be installed 
as outlined in these instructions. Appliance and flue clearances from combustible walls must be in accordance with 
heater manufacturers’ specifications and NZS 5261:2003. 

N.B. It is the responsibility of the installer to ensure that 

the installation of this flue kit complies with the appliance manufacturers’ specifications for flues and those 
relevant Local Body requirements are adhered to. 

Also refer page 7. 

1) Locate heater in its proposed position and mark the points for penetration that are directly above the centre 
of the heater’s flue outlet. Check that the heater’s location allows the OUTER HEAT SHIELD to clear all 
structural timbers. 

2)  Cut  250mm  square  holes 

(930  model  cut  300mm  square  holes

)  where  penetration  is  required  to 

accommodate OUTER HEAT SHIELD. 

NB: A minimum 25mm clearance is required between OUTER 

HEAT SHIELD and combustible SURFACES

3) Fit timber nogs around holes where necessary. 
4) Assemble OUTER HEAT SHIELD lengths together ensuring seams are in line and 
secure  with  three  rivets  or  self-tapping  screws.  Position  OUTER  HEAT  SHIELD 
through the roof or chimney structure and lower (temporarily) onto the bottom spider 
positioned  over  the  heater  flue  spigot  (Plain  end  down).  Check  the  height  of  the 
OUTER HEAT SHIELD penetrates roof or chimney structure. The flue is required to be 
at least 500mm above the nearest point on any part of the roof. It is recommended 
that in some instances extending the flue above the ridgeline will be necessary. Refer 
to NZS 5261:2003 for more information. Additional flue and outer heat shields may 
have to be to achieve the correct termination height of the flue. Ensure the last outer 
heat  shield  section  is  PLAIN  ENDED  BOTH  ENDS  –  this  MAY  have  to  be  cut  to 
length. 

5)  Assemble  the  150mm 

(930  model  uses  200mm)

  stainless  steel  FLUE  PIPES 

together  ensuring  all  seams  are  in  line  using  three  monel,  St  Steel  rivets  or  StSt 
screws  positioned  equidistant  around  the  flue  circumference  and  seal  joints  with 
appropriate heat sealant.  

6) Fit FLUE SPACER BRACKETS to FLUE 

if necessary

 to maintain air gap between 

FLUE PIPES and OUTER HEAT SHIELD

7) Position stainless steel FLUE pipes from the roof into the OUTER HEAT SHIELD 
(crimped ends towards heater) and into the heater flue spigot with appropriate heat 
sealant. The OUTER HEAT SHIELD will need to be lifted off the bottom spider to 
achieve  this.  Once  the  flue  is  in  place  and  sealed  position  and  clamp  the  bottom 
spider to the flue pipe and reposition the outer heat shield over the bottom spider. 

8) Secure OUTER HEAT SHIELD to heater, if necessary. 

9) Using ANGLE BRACKETS secure OUTER HEAT SHIELD to nogs around penetration holes. 

NB  A

 

minimum  25mm  clearance  is  required  between  OUTER  HEAT  SHIELD  and 

combustible surfaces

 

10) Fix an appropriate

 flashing around the outer heat shield to seal onto the roofing or chimney material. 

11) Fix TOP FLUE SPACER BRACKET to the flue making sure lugs fit snugly inside OUTER HEAT SHIELD, ensuring 
the flue pipe protrudes no higher than the last section of OUTER HEAT SHIELD, insert the cowl spigot into the flue pipe, 
push down for a snug fit and insert 1 x SS screw to hold the cowl in place. 

12) Fit GAS COWL into FLUE pushing down fully onto TOP SPACER BRACKET. Secure the last OUTER HEAT 
SHIELD to the 3 x StSt locating tabs under the cowls lower shield, with StSt or Monel screws. 

YUNCA ZERO CLEARANCE FLUE KIT (3.6m) CONTENTS  

 

730 model (and discontinued 630: 

 

3 x 150mm x1200mm StSt Flue   

1 x 200mm x 1200mm Galv outer heat shield (plain both ends) 

1 x Std Gas cowl 

 

 

2 x 200mm x 1200mm Galv outer heat shield (swaged one end) 

1 x Bottom spider  

 

 

2 x inner / outer flue spacers (Note 6) 

 

930 model:

  

3 x 200mm x1200mm StSt Flue  1 x 250mm x 1200mm Galv outer heat shield (plain both ends) 
1 x Std Gas cowl 

 

 

2 x 250mm x 1200mm Galv outer heat shield (swaged one end) 

1 x Bottom spider  

 

 

2 x inner / outer flue spacers (Note 6) 

Flue pipe 
to be no 
more than 
25mm 
higher 
than outer 
heat 
shield

 

Last outer 
is plain 
both ends 
Ref note4

 

Outer 
heat 
shield is 
swaged 
one end 

 

Содержание 730

Страница 1: ...OOR MODELS 930 and 730 Also includes information for the 630 model for which production was discontinued in 2010 MAY 2010 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions should be stored in a convenient safe place for ready reference Also available to download online at www yunca co nz ...

Страница 2: ...dix B SPARE PARTS LIST 20 21 Appendix C WARRANTY 22 Appendix D WARRANTY REGISTRATION 23 INTRODUCTION Welcome and congratulations on purchasing your YUNCA ALLURE INDOOR ELECTRONIC CONTROL flued gas open fire Please read these Operating Instructions carefully before attempting to operate the heater and ensure all members of your home understand how this elegant heater functions If you have any quest...

Страница 3: ...MATERIALS NEAR THIS APPLIANCE DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT IS OPERATIONAL ENSURE THAT HOME VENTILATION SYSTEMS DO NOT AFFECT THE DRAW OR FLAME PATTERN OF THE FIRE STAINLESS STEEL FASCIAS are shipped with protective plastic in place to reduce the risk of damage in transit Only remove this plastic immediately before fitting the fascia to the fire Do not use abrasi...

Страница 4: ...00 360 235 590 670 1100 940 200 250 Production of the 630 model was discontinued in 2010 however the installation maintenance and operation information has been retained in this manual for ease of reference by existing owners Also available is a Bottom Fascia Strip for each model This 85mm high strip is fitted below a regular three sided fascia for a picture frame look CLEARANCES Floor protector 3...

Страница 5: ...t approaches with air venting but both require the use of zero clearance flue kits 1 For dedicated chimney chases NOT open to the roof ceiling cavity The chase must be vented at the bottom near the base level of the fireplace with 2 individual vents preferably one each side of the fire each with a minimum size of 100mm x 50mm opening Identical vents must be repeated near the top of the chase prefe...

Страница 6: ...mble the 150mm 930 model uses 200mm stainless steel FLUE PIPES together ensuring all seams are in line using three monel St Steel rivets or StSt screws positioned equidistant around the flue circumference and seal joints with appropriate heat sealant 6 Fit FLUE SPACER BRACKETS to FLUE if necessary to maintain air gap between FLUE PIPES and OUTER HEAT SHIELD 7 Position stainless steel FLUE pipes fr...

Страница 7: ... b In the case of a Flat roof i e With a Pitch of less than 30 not less than 1500 mm above the Highest Point of the Roof c In any case the length of the Flue shall be not less than 3 6 metres from the Top of the Appliance Flue Spigot 2 Minimum Total Flue Length 3 6 metres 3 Flue must be 1 2 metres high before any Lateral is fitted 4 Any Lateral run in a Flue shall be a No more than 1 0 metre in th...

Страница 8: ...y need to be completed before the heater is finally positioned Fig 2 6mm dia x 50mm Coach Bolts Supplied If the appliance is being attached to a concrete floor dyna bolts should be used if the floor is wooden the bolts used should be long enough to go fully through the floorboards and fixed with nuts and washers from the underside Fig 1 Fig 2 30 mm 15 mm 15 mm 80 mm Gas Pipe Hole Electrical Cable ...

Страница 9: ... the first two threads at the tip of any gas connection All joints should be tested for leaks before operating the fire Gas pressure requirements Correct gas pressure and the use of a properly sized gas supply line are essential for the safe and efficient performance of this appliance The inlet and outlet pressures at the control must be tested on installation Note Improper gas pressure will affec...

Страница 10: ...e This will expose the control valve so manometer tubes can be attached to the pressure taps as shown below Fig 4 Important Ensure Pressure Tap is tightened and checked for leaks after testing Control Valve Parts Fig 4 and Fig 5 1 Main Gas Inlet 2 Inlet Pressure Tap Point Tighten to torque 1 0Nm 3 High Pressure Adjust 10mm Brass Nut 4 Low Pressure Adjust Red Plastic X Screw 5 Outlet Pressure Tap P...

Страница 11: ...at adjustment will be required during installation Setting Pressures Fig 4 and 5 MAXIMUM PRESSURE The modulator is adjusted by screwing IN Brass Nut 5 to increase the outlet pressure and screwing OUT to decrease it MINIMUM PRESSURE Keep Brass Nut 5 stationary screw IN the Red Plastic Screw 4 to increase the pressure and screw it OUT to decrease the pressure Pilot Outlet 4 5 ...

Страница 12: ...ved you will see where the bottom strip is fitted using two screws 4 TOP LOUVRE 1 Top Slides out for easier access to the top front cowl and flue spigot refer 7 May be left in place if access to the flue spigot is not required 5 TOP LOUVRE 2 Bottom Remove two screws and slide off May be left in place if work is not being carried out on the top cowl or flue spigot 6 BOTTOM CONTROL AND GRILL Remove ...

Страница 13: ... lift out 5 Rear Tray Remove screws from right and left side lift out 6 Burners Lift out 7 Manifold Baffles Lift out left and right baffles SETTING THE FIRE 1 Replace all panels and grate 2 Check for gas ignition also check that the remote control operates flame and fan boost before setting the fire 3 Follow layout see following pages for setting of the fire 4 Re check gas ignition remote control ...

Страница 14: ...oals per row layout as shown below from left to right Coals are numbered on the base Bottom Rear Row Bottom Front Row Top Rear Row Top Front Row 930 26 x No1 Coals 26 x No2 Coals 4 rows of 13 730 20 x No1 Coals 20 x No2 Coals 4 rows of 10 630 16 x No1 Coals 16 x No2 Coals 4 rows of 8 Model discontinued 2 1 2 1 2 1 2 2 1 1 1 2 1 2 1 2 1 2 1 2 1 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 1 2 2 1 2 1 ...

Страница 15: ... No2 Layout shown is for the 930 model using 13 coals per row The 730 model uses 10 coals per row the 630 uses 8 coals per row layout as shown below from left to right Coals are numbered on the base Rear Row Front Row Logs 630 730 930 1 x B 1 x B 2 x B 1 x C 2 x C 1 x C 1 x D 1 x D 2 x D 1 2 1 2 1 2 1 2 1 2 2 1 2 1 2 1 2 1 2 1 2 1 1 2 2 1 630 730 C B D 930 ...

Страница 16: ...nd Control Direct the infra red beam from this hand control to the receiver mounted at the Control front The receiver will light up when receiving a signal from the hand control The hand control operates on 4 AAA size alkaline batteries Remove the battery cover on the back of the hand control to insert batteries paying attention to the polarity Note multiple pushes of any button s may cause a lock...

Страница 17: ...t is operating when a button is activated Change remote batteries Check mains power is on Ensure beam from the remote Check the fuse in the back of the control Box Remove rear tray to access No spark at pilot burner Check connection between electrode in pilot assembly and lead from control Poor or no spark Clean any build up Carbon on or around the Spark electrode Tracking of spark along spark ele...

Страница 18: ...that the clearances around the appliance match those stated in this manual Flue way blocked Remove blockage Check cowl LPG gas mix incorrect Contact supplier to clean out bottle Flame Height very large or very low Use remote and Ramp up or down Check gas inlet pressure and running pressure Check and set gas pressure to manufacturers specifications Main burners extinguishing Flue down draughting Th...

Страница 19: ...Revised 26 05 10 ALLURE ELECTRONIC Install Ops May2010 Page 19 of 23 ...

Страница 20: ...8M Remote Hand Control 6598N Receiver Control box PCB for SIT845 6598P 845 Sigma Control Valve 6598Q 537 Electronic Flame Control Assembly 6598R Flame Rod 6598S Spark Electrode 6624GO Fan Assembly complete EGO 6955GO Rear Tray 630 730 930 6956GO Front Tray 630 730 930 6958GO6 Manifold Baffle 630 6958GO L Manifold Baffle Left hand Side 730 930 6958GO R Manifold Baffle Right Hand Side 730 930 6791GO...

Страница 21: ... 7 0 8 0 8 0 8 0 8 0 7 0 7 0 6 930 model Natural Main Jets ALL are 1 2mm dia Fascia Panels Should you require replacement fascia panels please also supply the measurements as there have been some design changes over time Key where an appears this substitutes for the model number i e 9 930 7 730 6 630 Part Name Colour Option Stainless Steel Gunmetal Black Silver 730 930 630 730 930 630 730 930 Fasc...

Страница 22: ... in outdoor situations A manual control OUTDOOR series is available specifically designed for outdoor use Please contact your Yunca Agent for details This warranty is void if the recommended service schedule is not implemented as suggested in this manual and is not carried out by a suitably qualified person Limitations of Liabilities Yunca Heating hereby waivers any liability for incidental and co...

Страница 23: ...By Date Manufactured by Yunca Gas Dunedin PO Box 500 DUNEDIN 9054 Telephone 03 488 4342 Email dunedin yunca co nz Web www yunca co nz Cut along here MANUFACTURER COPY This section must be returned within 10 days of purchase YUNCA ALLURE ELECTRONIC WARRANTY REGISTRATION Serial Model No Gas Type Purchase Date Purchasers Name Purchasers Address City Postcode Telephone Where Purchased Installed By Dat...

Отзывы: