Revised 26/05/10
ALLURE ELECTRONIC Install Ops May2010
Page 3 of 23
CAUTIONS:
THE YUNCA ALLURE ELECTRONIC REQUIRES 240V POWER TO OPERATE.
ENSURE THAT THE POWER SWITCH IS READILY ACCESSIBLE.
DO NOT install the power switch inside any cavity area.
This appliance must be flued to the atmosphere
.
This installation and any future service or repair work must be carried out by a suitably qualified
person and comply with the current New Zealand (Australian installation code) NZS 5261:2003 (AG
601:2002)
Control valve compartments, burners, fan, and air circulating passageways of the
ALLURE
must be
kept free from any lint and dust build-up to ensure efficient and safe operation of the heater.
DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIANCE.
DO NOT USE OR STORE FLAMMABLE MATERIALS NEAR THIS APPLIANCE.
DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS APPLIANCE WHILE IT
IS OPERATIONAL.
ENSURE THAT HOME VENTILATION SYSTEMS DO NOT AFFECT THE DRAW
OR FLAME PATTERN OF THE FIRE.
STAINLESS STEEL FASCIAS…
are shipped with protective plastic in place to reduce the risk of damage in
transit.
Only remove this plastic immediately before fitting the fascia to the fire.
Do not use abrasive cloths or cleaners on stainless steel fascias. Use only
specialised Stainless Steel cleaners available from your local hardware
store.
MAINTENANCE
YUNCA GAS HIGHLY RECOMMENDS THAT a qualified service person should conduct an
annual inspection and undertake any maintenance required on your Yunca Allure.
Its’ venting and installation must be checked to keep it running safely and efficiently.
Procedures should be performed only by a qualified service person.
The gas supply and electrical power should be isolated whenever any maintenance
procedures are undertaken.