1)Power Input Connection

连接输入电源

Connect POWER-BLACK and POWER-WHITE to AC220V(Figure2)and earth 

POWER_GREEN line.

如图

2POWER-BLACK

线和

POWER-WHITE 

线连接在

AC220V

电源

POWER_GREEN

线与地线连接 。

2

Signal Input Connection

连接输入信号

Connect SIGNAL  GREED and SIGNAL BLUE to SIGNAL INJECTION.

如图

2 SIGNAL-RED

线与

SIGNAL-BLUE

线连接在注塑机的

INUECTION

信号输出。

3

GATE Output Connection

输出信号连接

Connect Solenoid Valve as referred to figure 4.

Caution: Use the same electric poles using DC24V Solenoid Valve connection.

如图

4  

连接螺旋管针阀

(SOLENOIDE VALVE)

注意

使用有电极的

DC24V

针阀时

,

如上图正确连接。

4

Gate Output Voltage Select

输出电压选择

Jumper Setting is located on the back of ACST-600 (Figure 3).

Connect AC220V using AC220V Solenoid Valve and DC24V Solenoid Valve to DC24V.

分离

ACST600

背面

,

可以看到如图

3

所示的

JUMPER SETTING 

的排列

,

使用

AC220V

螺旋

管针阀时把连接外壳与

AC220V

连接

DC24V

螺旋管针阀时把连接外壳与

DC24V

连接

11

Wiring Specification  

外部接线连接图

10

SEQUENCE  INJECTION  CONTROLLER

Input / Output Ratings

Supply Power: AC220V / 50Hz, 60Hz
Signal Input    : DC24V, AC220V(Free)
Gate Output1 :DC24V (100mA/Gate)
Gate Output2 : AC220v (100mA/Gate)

POWER

SINGAL

Figure 1

Figure 2

Figure 3

Figure 4

GATE SETTING

VOLTAGE SELECT

FUSE

250V/2A

1     2     3    4    5    6     7    8

GATE 1         GATE 2        GATE 3         GATE  4

GATE 5          GATE 6         GATE 7        GATE  8

(+)    (-)

Jumper setting

AC250V

DC24V

Gate Output Connection ex

.

WHITE

GREEN

RED 

BULE

Supply Power/Signal Input  

Connection ex.

9  10   11  12  13  14  15  16

+
_

DC 24V

SOL.V/V

OR

AC 220V

SOL.V/V

YELLOW

(+)    (-)

(+)    (-)

(+)    (-)

(+)    (-)

(+)    (-)

(+)    (-)

(+)    (-)

AC 220v

AC 220v

EARTH

SIGNAL IN

SIGNAL IN

USER’S MANUAL

Содержание ACT-D800

Страница 1: ...INSTRUCTION MANUAL TYPE ACT D800 Sequence Injection Controller Version 5 5 Sequence Injection Controller...

Страница 2: ...splay 3 6 Output 3 7 Start to Run 4 8 Menu Setting 5 9 Mode Specification 7 10 System Application 8 11 Wiring Specification 9 Before using the product please read this instruction manual carefully to...

Страница 3: ...lay unit Switch PCB 3 Central Processing Unit 1 S M P S To transform input AC220V to DC24V 1A DC5V 1A S M P S AC220V DC24V 1A DC5V 1A 2 M P U To control input output and display 3 RELAY Solenoid Valve...

Страница 4: ...e gate selected GATE a To turn On Off time ON OFF 5 Display 1 Display delay time and open time of each gate in display panel GATE OPEN 2 Display LED on while each gate opens GATE OPEN LED 3 Display MO...

Страница 5: ...nd open time value at each display panel GATE OPEN GATE 4 Switch between MODE A MODE B and gate off mode A mode B off A Press for 4 seconds a Buzzer rings and mode LED blinks MODE LED b MODE LED of 1s...

Страница 6: ...a Buzzer rings and MODE LED Blinks MODE LED b Unl displays in DEL panel and 999 or 99 9 9 99 display in OPEN panel GATE LED Unl OPEN 999 99 9 9 99 c Switch units using d Move gate using GATE e Hit to...

Страница 7: ...d Hit to save or keep idle for 4 seconds to automatic save 4 8 Set OPEN time OPEN Move using to get gate and its OPEN panel to confirm GATE OPEN a Right digit in OPEN panel blinks GATE OPEN b Set tim...

Страница 8: ...passed injection signal is keeping on it opens and it counts up the open time and displays it in OPEN display panel OPEN e When injection signal is off delay set time will be display in DEL display pa...

Страница 9: ...play panel and OPEN display panel respectively OPEN DEL OPEN 6 3 MODE C C INJECTION SIGNAL Del1 Open1 t1 Signal On t2 Signal Off MODE C Open2 Del2 T Example a In case injection signal 10sec DEL time D...

Страница 10: ...ltage DC24V or AC220V in compliance with Solenoid valve DC24V AC220V b Display output voltage in DC24V LED or AC220V LED DC24V AC220V B Input ON OFF Indicator ON OFF a When input is on SIGNAL LED is o...

Страница 11: ...ay Time t2 Injection time Gate Open Time T t 1 t 2 T t 1 t 2 Mode C Selecting mode C After the injection signal has been received the gate is closed during the DEL time t1 After the DEL time t1 has el...

Страница 12: ...uct Open the gate A to fill the major portion of the molded part and then open the gate B to fill the short molded area of the component A B Application for Mode B In case that there is a wide differe...

Страница 13: ...Connect AC220V using AC220V Solenoid Valve and DC24V Solenoid Valve to DC24V ACST600 3 JUMPER SETTING AC220V AC220V DC24V DC24V 11 Wiring Specification 10 SEQUENCE INJECTION CONTROLLER Input Output Ra...

Страница 14: ...7 MENO 10...

Страница 15: ...86 769 85394466 FAX 852 769 85394455 E MAIL yudo changan net YUDO WANCO SHUZHOU CO LTD TEL 86 512 65048882 FAX 86 512 65046886 E MAIL suzhou yudowanco com YUDO WANCO SHANGHAI OFFICE TEL 86 21 5059381...

Отзывы: