Maintenance and
Disassembly
Page 26
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
)RUYK
)RUYK
3GTOLURJ\GR\K
36G
6XKYY[XK
MG[MK
.GTJRK2U
.GTJRK.O
)NGXMKNUYK
)NGXMKNUYK
<GI[[S
V[SV
<GI[[S
V[SV
)USVU[TJSKZKX
2U
.O
Procedure:
1.
Tighten the flare nuts of the indoor and outdoor
units, and confirm that both the 2- and 3-way valves
are closed.
2.
Connect the charge hose with the push pin of Handle
Lo to the gas service port of the 3-way valve.
3.
Connect another charge hose to the vacuum pump.
4.
Fully open the Handle Lo manifold valve.
5.
Using the vacuum pump, evacuate the system for
30 minutes.
c.
Check whether the compound meter indicates
-0.1 MPa (14.5 Psi).
• If the meter does not indicate -0.1 MPa
(14.5 Psi) after 30 minutes, continue
evacuating for an additional 20 minutes.
• If the pressure does not achieve -0.1 MPa
(14.5 Psi) after 50 minutes, check for leakage.
• If the pressure successfully reaches -0.1 MPa
(14.5 Psi), fully close the Handle Lo valve, then
cease vacuum pump operations.
d.
Wait for 5 minutes then check whether the gauge
needle moves after turning off the vacuum pump.
If the gauge needle moves backwards, check
whether there is gas leakage.
6.
Loosen the flare nut of the 3-way valve for 6 or
7 seconds and then tighten the flare nut again.
a.
Confirm the pressure display in the pressure
indicator is slightly higher than the atmospheric
pressure.
b.
Remove the charge hose from the 3-way valve.
7.
Fully open the 2- and 3-way valves and tighten the
cap of the 2- and 3-way valve.
1.3.2 Outdoor Unit
Содержание YEFE BZTM-MOW1 Series
Страница 2: ......
Страница 4: ......
Страница 15: ...Specifications Page 11 YUFE18BYTM MO X YUFE24BYTM MO X Y G POWER SUPPLY 24V L N C 1 N 1 TO INDOOR UNIT...
Страница 18: ...Specifications Page 14 YUFE60BYTM MS 1 R S C YUFE60BYSM MS 1 R...
Страница 24: ...Product Features Page 20...
Страница 106: ...Contents i Temperature Sensor Resistance Value Table for T1 T2 T3 and T4 C K 112 i Pressure On Service Port 113...