Maintenance and
Disassembly
Page 22
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
)RUYK
)RUYK
3GTOLURJ\GR\K
36G
6XKYY[XK
MG[MK
.GTJRK2U
.GTJRK.O
)NGXMKNUYK
)NGXMKNUYK
<GI[[S
V[SV
<GI[[S
V[SV
)USVU[TJSKZKX
2U
.O
Procedure:
1.
Tighten the flare nuts of the indoor and outdoor units, and confirm that both the 2- and 3-way valves are closed.
2.
Connect the charge hose with the push pin of Handle Lo to the gas service port of the 3-way valve.
3.
Connect another charge hose to the vacuum pump.
4.
Fully open the Handle Lo manifold valve.
5.
Using the vacuum pump, evacuate the system for
30 minutes.
a.
Check whether the compound meter indicates -0.1 MPa (14.5 Psi).
• If the meter does not indicate -0.1 MPa
(14.5 Psi) after 30 minutes, continue
evacuating for an additional 20 minutes.
• If the pressure does not achieve -0.1 MPa
(14.5 Psi) after 50 minutes, check for leakage.
• If the pressure successfully reaches -0.1 MPa (14.5 Psi), fully close the Handle Lo valve, then cease vacuum
pump operations.
b.
Wait for 5 minutes then check whether the gauge needle moves after turning off the vacuum pump. If the
gauge needle moves backwards, check whether there is gas leakage.
Содержание YEFE BZTM-MOW1 Series
Страница 2: ......
Страница 4: ......
Страница 15: ...Specifications Page 11 YUFE18BYTM MO X YUFE24BYTM MO X Y G POWER SUPPLY 24V L N C 1 N 1 TO INDOOR UNIT...
Страница 18: ...Specifications Page 14 YUFE60BYTM MS 1 R S C YUFE60BYSM MS 1 R...
Страница 24: ...Product Features Page 20...
Страница 106: ...Contents i Temperature Sensor Resistance Value Table for T1 T2 T3 and T4 C K 112 i Pressure On Service Port 113...