![York YCAL0019 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/york/ycal0019/ycal0019_installation-operation-and-maintenance-manual_4084434015.webp)
15
JOHNSON CONTROLS
FORM 150.67-NM1
ISSUE DATE: 4/28/2017
1
SECTION 1 – GENERAL CHILLER INFORMATION AND SAFETY
INTRODUCTION
YORK YCAL0019-0066 (15-65 ton, 53-218kW) chill-
ers are manufactured to the highest design and con-
struction standards to ensure high performance, reli-
ability and adaptability to all types of air conditioning
installations.
The unit is intended for cooling water or glycol solu-
tions and is not suitable for purposes other than those
specified in this manual.
This manual contains all the information required for
correct installation and commissioning of the unit, to-
gether with operating and maintenance instructions.
The manuals should be read thoroughly before at-
tempting to operate or service the unit.
All procedures detailed in the manuals, including in-
stallation, commissioning and maintenance tasks must
only be performed by suitably trained and qualified
personnel.
The manufacturer will not be liable for any injury or
damage caused by incorrect installation, commission-
ing, operation or maintenance resulting from a failure
to follow the procedures and instructions detailed in
the manuals.
WARRANTY
Johnson Controls warrants all equipment and materials
against defects in workmanship and materials for a pe-
riod of eighteen months from date of shipment, unless
labor or extended warranty has been purchased as part
of the contract.
The warranty is limited to parts only replacement and
shipping of any faulty part, or sub-assembly, which has
failed due to poor quality or manufacturing errors. All
claims must be supported by evidence that the failure
has occurred within the warranty period, and that the
unit has been operated within the designed parameters
specified.
All warranty claims must specify the unit model, serial
number, order number and run hours/starts. Model and
serial number information is printed on the unit identi-
fication plate.
The unit warranty will be void if any modification to
the unit is carried out without prior written approval
from Johnson Controls.
For warranty purposes, the following conditions must
be satisfied:
•
The initial start of the unit must be carried out
by trained personnel from an Authorized John-
son Controls Service Center (see Commissioning
Page 147).
•
Only genuine YORK approved spare parts, oils,
coolants, and refrigerants must be used.
•
All the scheduled maintenance operations detailed
in this manual must be performed at the specified
times by suitably trained and qualified personnel
(see Maintenance Section, Page 215).
•
Failure to satisfy any of these conditions will au-
tomatically void the warranty (see Warranty Pol-
icy).
SAFETY
Standards For Safety
YCAL chillers are designed and built within an ISO
9002 accredited design and manufacturing organiza-
tion. The chillers comply with the applicable sections
of the following Standards and Codes:
•
ANSI/ASHRAE Standard 15 - Safety Code for
Mechanical Refrigeration.
•
ANSI/NFPA Standard 70 - National Electrical
Code (N.E.C.).
•
ASME Boiler and Pressure Vessel Code- Section
VIII Division 1.
•
ARI Standard 550/590-98- Water Chilling Pack-
ages Using the Vapor Compression Cycle.
• ASHRAE 90.1- Energy Efficiency Compliance.
•
ARI 370- Sound Rating of Large Outdoor Refrig-
eration and Air Conditioning Equipment.
•
Conform to Intertek Testing Services, formerly
ETL, for construction of chillers and provide
ETL/cETL listing label.
•
Manufactured in facility registered to ISO 9002.
•
OSHA – Occupational Safety and Health Act.
In addition, the chillers conform to Underwriters Labo-
ratories (U.L.) for construction of chillers and provide
U.L./cU.L. Listing Label.
Содержание YCAL0019
Страница 4: ...JOHNSON CONTROLS 4 FORM 150 67 NM1 ISSUE DATE 4 28 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...JOHNSON CONTROLS 14 FORM 150 67 NM1 ISSUE DATE 4 28 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 69: ...69 JOHNSON CONTROLS SECTION 5 TECHNICAL DATA FORM 150 67 NM1 ISSUE DATE 4 28 2017 5 5...
Страница 71: ...71 JOHNSON CONTROLS SECTION 5 TECHNICAL DATA FORM 150 67 NM1 ISSUE DATE 4 28 2017 5 5...
Страница 127: ...127 JOHNSON CONTROLS SECTION 5 TECHNICAL DATA FORM 150 67 NM1 ISSUE DATE 4 28 2017 5 5 DIMENSIONS YCAL0052 SI CONT D...
Страница 129: ...129 JOHNSON CONTROLS SECTION 5 TECHNICAL DATA FORM 150 67 NM1 ISSUE DATE 4 28 2017 5 5 DIMENSIONS YCAL0056 SI CONT D...
Страница 191: ...191 JOHNSON CONTROLS SECTION 8 UNIT OPERATION FORM 150 67 NM1 ISSUE DATE 4 28 2017 8 Figure 48 WIRING LD11799A...
Страница 202: ...JOHNSON CONTROLS 202 FORM 150 67 NM1 ISSUE DATE 4 28 2017 SECTION 8 UNIT OPERATION THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 229: ...229 JOHNSON CONTROLS SECTION 10 MAINTENANCE FORM 150 67 NM1 ISSUE DATE 4 28 2017 NOTES...