HANDLING AND STORAGE
DELIVERY AND STORAGE
To ensure consistent quality and maximum reliability,
all units are tested and inspected before leaving the fac-
tory. Units are shipped completely assembled and con-
taining refrigerant under pressure. Units are shipped
without export crating unless this has been specified
on the Sales Order.
If the unit is to be put into storage, prior to installation,
the following precautions should be observed:
• Unit must be “blocked” so that the base is not
permitted to sag or bow.
• Ensure that all openings, such as water connections,
are securely capped.
• Do not store where exposed to ambient air tem-
peratures exceeding 43°C (110°F).
• The condensers should be covered to protect the
fins from potential damage and corrosion, particu-
larly where building work is in progress.
• The unit should be stored in a location where there
is minimal activity in order to limit the risk of acci-
dental physical damage.
• To prevent inadvertent operation of the pressure
relief devices the unit must not be steam cleaned.
• It is recommended that the control panel keys are
removed and deposited with a responsible person
on-site.
• It is recommended that the unit is periodically in-
spected during storage.
3
INSPECTION
Remove any transit packing and inspect the unit to en-
sure that all components have been delivered and that
no damage has occurred during transit. If any damage
is evident, it should be noted on the carrier's freight bill
and a claim entered in accordance with the instructions
given on the advice note.
Major damage must be reported immediately to your
local YORK representative.
MOVING THE CHILLER
Prior to moving the unit, ensure that the installation
site is suitable for installing the unit and is capable of
supporting the weight of the unit and all associated ser-
vices.
The units are designed to be lifted using cables. A
spreader bar or frame 2250 mm (88") wide should be
used in order to prevent damage to the unit from the
lifting chains (See Figure 3 and 4).
Units are provided with lifting eyes extending from the
sides of the base frame which can be attached to di-
rectly using shackles or safety hooks (See Figure 4).
The unit must only be lifted by the base frame at
the points provided. Never move the unit on rollers,
or lift the unit using a fork-lift truck.
Care should be taken to avoid damaging the condenser
cooling fins when moving the unit.
Lifting Weights
For details of weights and weight distribution refer to
the Technical Data Section.
Содержание Millennium YCAS 0693
Страница 36: ...36 YORK INTERNATIONAL FIG 8 POWER PANEL SECTION CONT D OPTIONS PANEL LAYOUT TYPICAL 00246VIP Installation...
Страница 49: ...49 YORK INTERNATIONAL FORM 201 18 NM4 7 This page intentionally left blank...
Страница 65: ...65 YORK INTERNATIONAL FORM 201 18 NM4 LD04179 7...
Страница 79: ...79 YORK INTERNATIONAL FORM 201 18 NM4 This page intentionally left blank 7...
Страница 83: ...83 YORK INTERNATIONAL FORM 201 18 NM4 This page intentionally left blank 7...
Страница 87: ...87 YORK INTERNATIONAL FORM 201 18 NM4 LD04268 7...
Страница 119: ...119 YORK INTERNATIONAL FORM 201 18 NM4 COMPRESSOR COMPONENTS CONT D FIG 57 COMPRESSOR COMPONENTS LD03669 7...
Страница 120: ...120 YORK INTERNATIONAL COMPRESSOR COMPONENTS CONT D FIG 58 COMPRESSOR COMPONENTS LD03670 Technical Data...
Страница 121: ...121 YORK INTERNATIONAL FORM 201 18 NM4 COMPRESSOR COMPONENTS CONT D FIG 59 COMPRESSOR COMPONENTS LD03671 7...