7-3
IM AQ1100-01EN
Multicore Loss T
esting (-SPM and -HPM suffix codes)
1
2
3
4
5
6
7
8
9
10
11
App
Index
7.2 Sharing
Projects
The three different methods for sharing project information are listed below.
Procedure
Sending a Project
WARNING
• While this instrument is producing light, do not remove the optical fiber cable, because light
is emitted from the light source port. Visual impairment may occur if the light enters the
eye.
• Close the covers of any light source ports that do not have optical fiber cables connected
to them. On models with two or more light source ports, visual impairment may occur if light
that is mistakenly emitted from the wrong port enters the eye.
Connect one end of the communication fiber that you specified to the master’s light source port,
and connect the other end to the slave’s optical power measurement port. Then transfer the project
information.
4.
Press the
Project Transmission START
soft key to generate the optical signal
used to transmit the project information.
3.
Press the
Receive Project from Master
soft key.
On the menu, “Receive Project from Master”
changes to “Abort.”
After reception finishes, “Abort” changes back
to “Receive Project from Master” and the
following screen appears.
1.
Press the
Multi-Core Loss Test
soft key.
2.
Press the
Master/Slave
soft key to select
Master
.
3.
Create a new project (see section 7.1), or load a
project file (see the next page). The following menu
appears.
1.
Press the
Multi-Core Loss Test
soft key.
2.
Press the
Master/Slave
soft key to select
Slave
. The
following menu appears.
Slave
Master
Loss Test Screen
Loss Test Screen
On the menu, “Project Transmission START”
changes to “Project Transmission STOP.”
After transmission finishes, “Project
Transmission STOP” changes back to “Project
Transmission START” and the following screen
appears.
Now the master and slave share the same project information.