
<3. INSTALLATION>
3-6
IM 01E25D11-01EN
Mounting Procedure (with optional
Grounding Rings GR1 for sizes up to
1000 mm (40 in.)):
1. Handles of the grounding ring have some
holes which correspond to outer diameter
of each flange type. There are printings
near each hole. The printings show types
of flange. See the table below.
Printing
Process
Connection Code Flange Standard
ASME
-CA1
ASME B16.5
Class 150, ASME
B16.47 Class 150
AWWA
-CB1
AWWA C207
Class D
PN10
-CE1
EN1092-1 PN10
PN16
-CE2
EN1092-1 PN16
10K
-CJ1
JIS B2220 10K
AS
-CS1, -CS2, -CT1 AS2129 table D, E
AS4087 PN16
F12
-CG1
JIS F12 (JIS 75M)
2. Confirm the centering pin is fixed to the
hole corresponding to flange or fix the
centering pin to the correct hole.
3. Hang the grounding rings with their
flange type printings outer side of the
flowtube. Set the angle of both handles
symmetrically to be 45 degree from top. If
there are any bolt-holes under the handles,
turn the grounding rings clockwise in order
to locate handles between bolt-holes.
Center the grounding ring to the center of
the flowtube.
4. Connect the wire from the grounding ring
to the screw of the flowtube’s flange and fix
the wire by the nut. This procedure (item 1
to 4) must be done for the both sides of the
flowtube.
5. Install the flowtube into the customer’s pipe
with the gaskets A.
F0313.ai
Handle
Screw & Nut : Connect the wire from the
grounding ring or the customer’s pipe
Clockwise
Gasket B
Grounding Ring
Handle
Printed
Surface
Hole
Printing of
Flange Type
Flowtube
Centering Pin
Centering Pin
F12
10K
Note : Gasket A and B are also placed concentrically with
the flowtube.
Figure 3.3.5 Mounting Procedure with Grounding
Rings GR1 for sizes up to 1000 mm
(40 in.)
Mounting Procedure (with optional
Grounding Rings GR1 for sizes 1100mm (44
in.)) and above :
1. The grounding ring is temporarily fixed
onto the flowtube by four bolts. Hang the
grounding ring up using a crane or a hoist
so that it would not fall down from the
flowtube while setting the gasket B.
2. Unfasten the bolts and remove the
grounding ring off from the flowtube.
3. Place the gasket B to the flowtube. Cut out
holes on the gasket B if necessary, so that
the bolts can go through. Fix the grounding
ring to the flowtube by the four bolts again.
4. Connect the wire from the grounding ring
to the screw at the flowtube flange and fix
the wire by the nut. This procedure (item 1
to 4) must be done for the both sides of the
flowtube.
Содержание Admag AXW
Страница 1: ...User s Manual AXW Magnetic Flowmeter Remote Flowtube IM 01E25D11 01EN IM 01E25D11 01EN 2nd Edition...
Страница 7: ...Blank Page...
Страница 9: ...Blank Page...
Страница 19: ...Blank Page...
Страница 25: ...Blank Page...
Страница 31: ...Blank Page...
Страница 51: ...Blank Page...