02-4001-09 | Effective Date: May 29, 2018
Page-14
YES 45 FS/FI Storefront System
FRAME ASSEMBLY
STEP 6 (Continued)
FABRICATE SILL FLASHING
-For openings longer than 24’-0” the sill flashing needs to be spliced every twelve to fifteen feet
at the center of a D.L.O.
-Allow for a 3/8” joint for expansion between sill flashing members.
See
Detail 10.
Sill Flashing
3/8”
DETAIL 10
Содержание YES 45 FS
Страница 2: ......
Страница 35: ......
Страница 36: ...YKK AP America Inc 270 Riverside Parkway Suite 100 Austell Georgia 30168 www ykkap com...