Yingli Solar PV Modules, Installation and User Manual 

page 6

•  Bolts:  Modules  must  be  mounted  using  the  mounting  holes  located  on 

the rear side of the long frame parts using ¼ inch stainless steel bolts, 
nuts, and washers. Refer to the racking manufacturer for specific torque 
requirements. This mounting method has been tested for a maximum 
static load of 50 psf (2400 Pa) in both the positive and negative directions.

 

 
 
 
 
 

Figure 11: Detail of a bolt mounting attachment

•  Top-down  Clamps:  Third-party  clamps  that  have  been  designed  for  PV 

mounting structures are an approved mounting attachment method for Yingli 
Solar PV modules. Modules must be fastened using clamps applied to the top 
side of the long frame parts. A clamp holds two modules except for the clamps 
at the beginning and end of a module row. The centerline of the clamps must 
be in line with the mounting hole positions plus or minus a distance of two 
(2) inches (50mm). Clamps must be installed according to the manufacturer’s 
specified instructions with minimum bolt size of 1/4 inches. Do not apply 
excessive pressure on the frame such that the frame deforms. Refer to the 
clamp manufacturer for specific hardware and torque requirements. This 
mounting method has been tested for a maximum static load of 50 psf (2400 
Pa) in both the positive and negative directions. 

Figure 12: Detail of a top-down clamp mounting attachment

Only for UL listed products -

A.The System Fire Class Rating of the module or panel in a mounting system in 
combination with a roof covering complete with requirements to achieve the 
specified System Fire Class Rating for a non-BIPV module or panel.

B.Any module or panel mounting system limitations on inclination required to 
maintain a specific System Fire Class Rating.

I N S TA L L AT I O N   O F   YG E - Z   S E R I E S   

Z E P   CO M PAT I B L E   M O D U L E S

Yingli Solar offers the YGE-Z Series PV module which features a

 

modified 

aluminum frame that is compatible with mounting and grounding hardware 
manufactured by Zep Solar. Refer to the

 

‘YGE-Z Series Installation Supplement’ 

for installation information. Detailed design and installation information of Zep 
Solar’s mounting systems  please find “ YGE-Z Series Installation Supplement”.  
The YGE-Z Series PV module warranty will become void if 

 

non-Zep-certified 

hardware is attached inside the Zep Groove of 

 

the module frame. 

YGE-Z Series PV modules are also compatible with the mounting

 

and grounding 

methods included in this manual. 

M A I N T E N A N C E

Yingli Solar recommends that PV systems be periodically inspected by the 
installer, or other qualified person. 

The purpose of the PV system inspection is to ensure that all system components 
are functioning properly. At a minimum, this inspection should confirm the 
following:

–  All cables and connector attachments are undamaged

 

and properly secured

– No sharp objects are in contact with the PV module surfaces

–  PV modules are not shaded by unwanted obstacles

 

and/or foreign material

–  Mounting and grounding components are tightly secured

 

with no corrosion

Defects should be addressed immediately. 

 

Cleaning

Over time, dirt and dust can accumulate on the glass surface of the module, 
reducing its power output. Yingli Solar recommends periodic cleaning of PV 
modules to ensure maximum power output, especially in regions with low 
precipitation. 

In order to reduce the potential for electrical and thermal shock, Yingli Solar 
recommends cleaning PV modules during early morning or late afternoon hours 
when solar radiation is low and the modules are cooler, especially in regions 
with hotter temperatures. 

Never attempt to clean a PV module with broken glass or other signs of exposed 
wiring, as this presents a shock hazard.

Clean the glass surface of the PV modules with a soft brush using soft, clean 
water with a recommended pressure less than 100psi (690kPa), which is typical 
of most municipal water systems. Water with high mineral content may leave 
deposits on the glass surface and is not recommended.

Yingli Solar PV modules may contain a hydrophobic anti-reflective coating on 
the glass surface to enhance power output and reduce dirt and dust buildup. In 
order to avoid module damage, do not clean PV modules with a power washer 
or pressure washer. Do not use steam or corrosive chemicals to facilitate the 
cleaning of modules. Do not use aggressive tools or abrasive materials that could 
scratch or damage the glass surface. Failure to comply with these requirements 
may adversely affect the PV module performance. 

Yingli Solar PV modules are designed to withstand high snow loads. However, if 
removing snow is desired to enhance production, use a brush to gently remove 
snow. Do not try to remove frozen snow or ice from PV modules. 

D E CO M M I S S I O N I N G

The dismantling of PV systems must be performed with the same care and 
safety precautions used during the initial installation. The PV system can 
generate hazardous voltage even after the system has been disconnected. 
Follow safety regulations for working with live electrical equipment.

Screw

Backing Nut

Nut Washer

PV Laminate

Mounting Rail

Aluminum Frame

Mounting with bolts diagram 
Explode assembly

PV Laminate

Backing Nut

Aluminum Frame

Nut Washer

Support Structure

Screw

Содержание PANDA 48 Cell Series

Страница 1: ...ngli Solar at the time of sale to the direct customer Additional recommendations are provided to enhance safety practices and performance results Please provide a copy of this manual to the PV system...

Страница 2: ...PV module surfaces and do not apply paint or adhesive to any of the surfaces including the frame For your safety do not disassemble or modify Yingli Solar PV modules in any way Doing so may degrade pe...

Страница 3: ...m2 AM 1 5 and 25 C cell temperature As required by the US National Electric Code NEC the short circuit current Isc should be multiplied by a factor of 1 25 and the open circuit voltage Voc should be m...

Страница 4: ...rts of fixed equipment that are able to become energized by the PV system must be connected to the equipment grounding conductor in order to prevent electrical shock Refer to section 250 of the NEC fo...

Страница 5: ...for maintaining mechanical connections and holding electrical grounding devices in the proper position for electrical conductivity Such devices where supplied with the module and evaluated through the...

Страница 6: ...ds that PV systems be periodically inspected by the installer or other qualified person ThepurposeofthePVsysteminspectionistoensurethatallsystemcomponents are functioning properly At a minimum this in...

Страница 7: ...The fifth 2014 Installation Manual_UL_ EN_201404_v02 1 August 6 2014 The sixth 2014 Installation Manual_UL_ EN_201408_v02 2 March 18 2015 The seventh 2015 Installation Manual_UL_ EN_201503_v02 3 June...

Страница 8: ...t of the indicated values of Isc Voc and Pmax under Standard Test Conditions irradiance of 1000 W m2 AM 1 5 spectrum and a cell temperature of 25 C Refer to module datasheets for specific power output...

Страница 9: ...YL240C 30b 240 30 3 7 93 38 0 8 47 1000 15 YL235C 30b 235 29 9 7 87 37 6 8 41 1000 15 YL230C 30b 230 29 6 7 76 37 0 8 40 1000 15 YL225C 30b 225 29 4 7 66 36 4 8 39 1000 15 PANDA 48 Cell Series YL215C...

Страница 10: ...0 38 07 967 43 31 1100 3 94 100 2 17 55 3 94 100 3 94 100 A A A A 38 98 990 37 24 946 1 97 50 22 72 577 16 02 408 77 56 1970 22 72 577 77 56 1970 47 24 1200 3 94 100 Grounding holes 6 0 236 6 Mounting...

Страница 11: ...AR AND SIDE VIEW DIMENSIONS OF MODULE SERIES UNITS INCH mm PANDA 48 Cell SERIES PANDA 60 Cell SERIES Legend Legend Grounding holes Mounting holes Drainage holes Mounting tolerance PANDA 48 Cell PANDA...

Отзывы: