
10 Capacitor Discharge Time
E-67
-7S SERVOPACKs
SERVOPACK
Model:
SGD7S-
Discharge Time
AC Power
Supply Input
DC Power
Supply Input
R70A
6 min (60 ms
*1
)
6 min
R90A
6 min (60 ms
*1
)
6 min
1R6A
6 min (60 ms
*1
)
6 min
2R8A
6 min (70 ms
*1
)
6 min
3R8A
80 ms
10 min
5R5A
140 ms
15 min
7R6A
140 ms
15 min
120A
(3-phase 200-
VAC input)
50 ms
10 min
120A
008
(single-phase
200-VAC input)
60 ms
20 min
180A
60 ms
20 min
200A
60 ms
20 min
330A
70 ms
30 min
470A
90 ms
*2
50 min
550A
60 ms
*2
65 min
590A
70 ms
*2
75 min
780A
90 ms
*2
100 min
*1. Values in parentheses apply when an External Regenerative Resistor with a
minimum allowable resistance of 40
is connected.
*2. This value is for when the optional Regenerative Resistor Unit is connected.
-7W SERVOPACKs
SERVOPACK
Model: SGD7W-
Discharge Time
AC Power
Supply Input
DC Power
Supply Input
1R6A
70 ms
10 min
2R8A
140 ms
15 min
5R5A
60 ms
20 min
7R6A
60 ms
20 min