Set second gable wall
on floor and secure using one 2" screw on each side
(Fig A)
.
1
ENSURE TOP WALL FRAMES ARE FLUSH.
2
42
3" (7,6 cm)
GABLE DOOR WALL INSTALLATION
2" (5,1 cm)
x40
x2
x28
1-1/2" (3,8 cm)
PARTS REQUIRED:
3" (7,6 cm)
x6
2" (5,1 cm)
x4
BEGIN
Remove Temporary Supports
and stand gable door wall on floor.
It is important to secure the front wall in the following order:
Fig. B
2"
(5,1 cm)
Screw
2"
(5,1 cm)
Screw
Flush
Flush
Fig. A
2" (5,1 cm)
Screw
Flush
Flush
Flush
IF YOU CHOSE THE EAVE SIDE WALL FOR
DOOR LOCATION, USE SECOND GABLE END
WALL IN PLACE OF WALL SHOWN HERE.
2ND GABLE
END WALL
Move to the bottom of gable end wall and secure bottom of wall using one 2" screw into
eave wall bottom plate
(Fig B)
.
ENSURE WALL PANELS ARE FLUSH BEFORE SECURING.
2" (5,1 cm)
Screw