background image

70

PARTS REQUIRED:

LOFT

x4

2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)

TP

x48

3" (7,6 cm) 

2 x 4 x 24" (5,1 x 10,2 x 61 cm)

RL

x4

Orient parts TP and 

RL

 on a fl

at surface. Spread glue across 

RL

 and TP as shown. 

Hold parts TP and 

RL

 flush and aligned

.

1-3/4"

(4,4 cm)

1-3/4"

(4,4 cm)

x2

Glue

RL

TP

TP

Flush

Flush

Flush

3" (7,6 cm)

Nails x12

RL

2

3

4

5

 

Assemble joist with 3" nails in a staggered pattern.

 

Turn assembled joist over and repeat staggered 

nail pattern.

Repeat Steps 1-3

 to assemble one more loft joist 

(Fig. A)

.

Support and drill a 7/16" hole through each end of each joist 

(Fig. B)

.

BEGIN

¸

1

Fig. B

Fig. A

Flush

Содержание RIDGEMOOR GABLE 10 x 12

Страница 1: ...or product information call our toll free number 1 800 844 9273 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM...

Страница 2: ...This page intentionally left blank...

Страница 3: ...NGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended meth...

Страница 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Страница 5: ...hown below as shaded Below is a list of additional materials not included x3 x12 2 x 4 x 10 5 x 10 x 304 8 cm Treated Lumber Cut to 3 2 x 4 x 117 5 x 10 x 297 2 cm ea 3 7 6 cm Hot Dipped Galvanized Na...

Страница 6: ...IM x3 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA x4 3 8 x 1 3 4 x 81 7 8 1 0 x 4 4 x 208 cm x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 3 4 1 9 cm 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measu...

Страница 7: ...0 1 8 5 1 x 7 6 x 25 7 cm AE x6 1 x 4 x 96 2 5 x 10 2 x 243 8 cm x1 KP WALL PANEL DOORS PARTS LIST x8 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 LEFT DOOR x1 RIGHT DOOR x1 3 8 x 48 x 84 1 x 121 9 x 213 4 c...

Страница 8: ...6 cm 2 5 1 cm 1 1 2 3 8 cm x2 10 1 2 x 32 1 2 26 7 x 82 6 cm 1 2 5 cm x2 3 4 1 9 cm x8 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged seperately special coating x16 1 2 5 cm x4 x1 x4 3 4 Tech Screw with...

Страница 9: ...nd For best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL R...

Страница 10: ...ll sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slab...

Страница 11: ...7 5 1 x 10 2 x 297 2 cm PARTS REQUIRED Center on marks FLOOR FRAME Flush Flush HINT For easier nailing stand on frame 2 1 Use two 3 nails at each mark Orient parts as shown on flat surface Measure and...

Страница 12: ...will be approximately 187 7 16 476 1 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame...

Страница 13: ...or frame is square by installing one panel and squaring frame Fig C Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame i...

Страница 14: ...inside panels 5 7 6 x1 x2 5 8 x 48 x 96 1 6 x 122 x 243 8 cm 5 8 x 47 7 8 x 48 1 6 x 121 9 x 122 cm x1 5 8 x 23 7 8 x 96 1 6 x 60 6 x 243 8 cm x1 5 8 x 23 7 8 x 48 1 6 x 60 6 x 122 cm x124 2 5 1 cm FL...

Страница 15: ...EAVE SIDE WALL Check the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your ass...

Страница 16: ...at both ends for squareness BEGIN 1 Secure one PVA flush to the floor deck using two 3 screws Measure over 120 3 4 and install a second PVA flush to the floor deck PVA will overhang the floor Secure...

Страница 17: ...attach a second gusset using glue and 12 2 nails No need to use jig for this gusset 4 5 3 2 Keep ECN firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should...

Страница 18: ...CATION GO TO Next Page TO BEGIN BUILDING YOUR WALLS OPTIONAL DOOR LOCATED ON EAVE SIDE WALL toward left IF YOU CHOOSE TO LOCATE THE DOOR TOWARD THE LEFT GO TO Page 25 TO BEGIN BUILDING YOUR WALLS CHOO...

Страница 19: ...2 FRONT WALL x2 2 x 4 x 32 1 2 5 1 x 10 2 x 82 5 cm QS 32 1 2 82 5 cm 32 1 2 82 5 cm BEGIN 1 Use two 3 nails at each mark Orient parts on edge on floor Measure and mark 2 Maintain 67 dimension 104 1 2...

Страница 20: ...m AM x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm YFA 18 HINT For easier nailing stand on frame 3 7 6 cm PARTS REQUIRED x32 FRONT WALL 3 Orient parts on edge Use two 3 nails at each location AM YFA YFA 3 7 6 c...

Страница 21: ...shown Secure panel with two 2 nails 6 15 2 cm apart Repeat Step 4 to attach the right 48 x 84 panel 5 4 48 x 84 121 9 x 213 4 cm x1 LEFT 1 RIGHT Maintain Flush Maintain Flush Primed side up Primed si...

Страница 22: ...ecure panel with two 2 nails 6 15 2 cm apart Repeat Step 4 to attach the right 11 7 8 x 84 panel 5 4 You have finished building your front door wall FINISH 7 11 7 8 x 84 30 2 x 213 4 cm Maintain Flush...

Страница 23: ...G x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x6 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x3 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA...

Страница 24: ...E SIDE WALL WITH DOOR RIGHT PARTS REQUIRED 3 7 6 cm x32 Orient parts on edge on floor as shown Use two 3 nails as shown AM x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm YF...

Страница 25: ...Fig A Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge...

Страница 26: ...8 You have finished building your DOOR WALL FINISH 10 x90 EAVE SIDE WALL WITH DOOR RIGHT PARTS REQUIRED 2 5 1 cm 9 Carefully flip the DOOR WALL over 6 15 2 cm 3 4 1 9 cm 6 15 2 cm 3 4 1 9 cm 48 x 84 1...

Страница 27: ...G x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x6 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x3 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA...

Страница 28: ...E SIDE WALL WITH DOOR LEFT PARTS REQUIRED 3 7 6 cm x32 Orient parts on edge on floor as shown Use two 3 nails as shown AM x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm YFA...

Страница 29: ...Fig A Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge...

Страница 30: ...el 8 You have finished building your DOOR WALL FINISH 10 x90 EAVE SIDE WALL WITH DOOR LEFT PARTS REQUIRED 2 5 1 cm 9 Carefully flip the DOOR WALL over 6 15 2 cm 3 4 1 9 cm 6 15 2 cm 3 4 1 9 cm 48 x 84...

Страница 31: ...r easier nailing stand on frame x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x7 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x32 29 3 7 6 cm BEGIN 1 Orient parts on edge on flo...

Страница 32: ...e with primed side up as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with two 2 nails in the corners Fig A Nail the panel using 2 nails 6 apart on edges and 12...

Страница 33: ...ith primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 6 Place end 48 x 84 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 1...

Страница 34: ...ONLY ONE GABLE END WALL BEGIN ON THIS PAGE 3 7 6 cm Nails TK x6 STL YFA YFA STL 3 7 6 cm Nails 44 1 2 113 cm 44 1 2 113 cm 92 1 2 235 cm 68 1 2 174 cm 68 1 2 174 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2...

Страница 35: ...rame flush at top and with a 3 4 gap on right side Maintain 3 4 measurement along edge x52 2 5 1 cm 33 GABLE END WALL A 12 30 5 cm 3 1 2 8 9 cm 3 4 GAUGE BLOCK GAA 48 x 84 122 x 213 4 cm x1 3 4 GAUGE...

Страница 36: ...intain flush along panel edges 48 122 cm 23 7 8 60 6 cm 12 30 5 cm 6 15 2 cm Flush Place 23 7 8 x 84 primed side up and flush with installed 48 x 84 panel edge Ensure panel is flush at top Secure usin...

Страница 37: ...D WALL BEGINNING HERE IF YOU CHOSE THE GABLE END WALL FOR DOOR LOCATION STOP HERE GO TO PAGE 38 3 7 6 cm Nails 3 7 6 cm Nails 1 1 2 3 8 cm TOENAILING HINT For easier nailing stand on frame BEGIN 1 Use...

Страница 38: ...up onto frame flush at top and with a 3 4 gap on right side Maintain 3 4 measurement along both edges x52 2 5 1 cm 36 GABLE END WALL B 12 30 5 cm 3 4 GAUGE BLOCK GAA 48 x 84 122 x 213 4 cm x1 3 4 GAU...

Страница 39: ...ace 48 x 84 panel primed side up and flush with installed 48 x 84 panel edge Ensure panel is flush at top Secure using 2 5 1 cm nails 6 15 2 cm apart on edges and 12 30 5 cm apart on inside of panel P...

Страница 40: ...using 3 nails Fig A 4 3 7 6 cm x12 x2 x25 RIGHT EAVE WALL INSTALLATION 3 7 6 cm Screws OO 3 Nails into bottom plate D O O R 3 7 6 cm Screw BEGIN Stand right sidewall on floor Center right sidewall as...

Страница 41: ...standing your GABLE END WALL FINISH 7 Secure gable wall to floor using 3 nails Fig C Nail gable wall panel to eave wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 6 15 2 cm Flush Fig A Fig B 2 5 1 cm...

Страница 42: ...TION 144 365 8 cm Nail gable wall panel to eave wall stud using 1 1 2 nails 6 apart Fig B 5 6 3 ENSURE GABLE AND EAVE WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Fig B 1 1 2 3 8 cm Nails Fig C BE...

Страница 43: ...frame Fig D 7 Secure eave wall bottom plates to floor using 3 nails Fig D Remove temporary braces 8 9 3 7 6 cm x12 2 5 1 cm x18 LEFT EAVE WALL INSTALLATION D O O R 3 7 6 cm Nails Nail 2 nails first 2...

Страница 44: ...able door wall on floor It is important to secure the front wall in the following order Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fig A 2 5 1 cm Screw Flush Flush Flush IF YOU CHOSE THE EAVE SID...

Страница 45: ...o eave wall studs using 1 1 2 nails 6 apart Fig E 2 5 1 cm Nails Angle nail to hit floor frame FINISH 7 4 3 5 6 1 1 2 3 8 cm Nails Fig F 3 7 6 cm Screw Fig E Secure gable door wall top frame 2 x 4 usi...

Страница 46: ...d secure using 1 1 2 nails 2 1 BEGIN 3 4 5 Place second RL as shown Place MIDDLE front gable panel flush to installed left panel Ensure panels are flush Secure panel to installed RL using 1 1 2 nails...

Страница 47: ...t parts as shown Fig A You will build FOUR assemblies Fig B x8 2 x 3 x 75 1 4 5 1 x 7 6 x 191 1 cm ECA x16 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x64 Fig B x4 Fig A Flush Flush Flush Flush Fl...

Страница 48: ...assemblies as shown Fig E You will build TWO complete assemblies 3 7 6 cm x8 Fig E Fig F x2 Gable Assemblies Flush Flush Flush Flush 3 7 6 cm Screws Attach PVA to ladder assembly using 3 screws Fig F...

Страница 49: ...crews toe screwed into RL at an angle as shown in Fig B 3 2 5 1 cm x42 4 Repeat Steps 1 3 to attach back gable unit On the inside secure gable with two 3 screws toe screwed into RL at an angle as show...

Страница 50: ...te with two 3 screws above notch Fig B C You have finished attaching your TRUSSES 4 BEGIN 1 Align over studs Locate first truss on top plate aligned over studs at each side and tight to side wall Fig...

Страница 51: ...m measurement on the rafter Fig A and the panel flush at the gable end overhang Fig B Secure panel with two 2 5 1 cm nails in the corners 2 Attach a 27 1 4 x 96 roof panel with the rough side up with...

Страница 52: ...C and flush with the rafter ends Fig B Secure panel with two 2 5 1 cm nails in the corners Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel PARTS REQUIRED ROOF PANELS 6 15...

Страница 53: ...panel and keep spacing between the center of the rafters Fig F Secure with one 2 nail into each rafter Fig F Place another 48 x 80 upper roof panel rough side up and flush with the installed 48 x 80...

Страница 54: ...2 nails 6 apart on edges and 12 apart inside panel You have finished installing your roof panels Repeat process to attach roof panels on the opposite side 8 PARTS REQUIRED ROOF PANELS FINISH 9 6 15 2...

Страница 55: ...rd Fig D Secure using twelve 2 finish nails Repeat Steps 1 2 to attach soffit boards on the opposite side Ensure soffit boards are flush at seam Fig B and flush at peak Fig D x4 3 8 x 7 7 8 x 73 5 16...

Страница 56: ...ls two in each rafter Repeat Step 1 to attach eave side soffit boards on the opposite side Ensure soffit boards are flush at rafter ends Fig B and flush at seams x4 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184...

Страница 57: ...s 1 2 to attach fascia boards on the other gable end 3 You have finished installing your gable fascia FINISH 4 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7...

Страница 58: ...wn Fig A Secure using 2 finish nails into rafter ends Repeat Step 1 on opposite eave You have finished installing your eave side fascia FINISH 3 1 BEGIN PARTS REQUIRED x4 3 8 x 4 3 4 x 80 5 8 1 x 12 1...

Страница 59: ...rated caulk BEGIN 1 From back side of door position window in opening and ensure square with door edge Use four screws to secure each window 3 2 Lay doors face down on a clean flat surface Apply high...

Страница 60: ...Tighten securely Attach temporary support GAA with two 1 5 8 screws as shown Tighten securely OO GAA SPACER Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bottom edges flush NOTE...

Страница 61: ...floor using ten 3 screws as shown Make sure screws go into framing and floor Fig C D 9 3 7 6 cm Screws into the wall support and floor frame Fig B SEAM Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Attac...

Страница 62: ...eleven 3 4 special coating screws into floor as shown Fig C 5 You have finished securing your door and trim FINISH 6 BEGIN 1 2 Secure two horizontal door rails AH with four 3 4 screws from behind to c...

Страница 63: ...door Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH 4 Repeat Steps 1 2 to install OO on right door 3 Secure using 7 2 screws through outside trim into OO Fig B 2 Fig A Center OO in door op...

Страница 64: ...e on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 You have finished p...

Страница 65: ...4 x2 1 1 4 x2 Handle locking with Screws x1 x4 3 4 Tech Screw with drill point 1 1 4 x8 3 Point Door Locking Mechanism RIGHT DOOR Set Screw 1 1 4 Wood Screw Pre drill for screws 1 1 4 Pan Head Screw...

Страница 66: ...ng locations of brackets and plates 3 4 Tech Screw Washer Washer UPPER BRACKET with offset Orient bracket as shown Washer Washer Plate 3 4 Tech Screw 1 1 4 Pan Head Screw Orient bracket as shown LOWER...

Страница 67: ...65 45o DOOR HARDWARE 2 1 4 2 1 4 TOP of Door RIGHT DOOR LEFT DOOR IMPORTANT This rod to edge of door Make sure rods are straight up and down when locating brackets BOTTOM of Door...

Страница 68: ...66 DOOR HARDWARE Align Plates with vertical rod points Drill thru with 3 8 drill bit to 2 depth into header and floor PLATE FRAMING PLATE FLOOR VERTICAL RODS Drill with 3 8 bit to 2 depth...

Страница 69: ...2 to attach trim to all four corners Finish attaching trim flush to corners Fig B using six 2 5 1 cm finish nails as shown You have attached your corner trim 3 2 81 7 8 208 cm 81 7 8 208 cm 81 7 8 20...

Страница 70: ...1 BEGIN 2 x36 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x6 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 PARTS REQUIRED AE x5 x1 2 5 1 cm Nail Flush Flush Flush 33 1 2 85 1 cm LEVEL Corner Stud Left Shel...

Страница 71: ...ls at each support as shown 3 FINISH 5 You have finished installing your shelves 4 x28 2 5 1 cm 7 16 x 11 7 8 x 23 7 8 1 1 x 30 2 x 60 6 cm x1 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 1 x 4 x 23 7...

Страница 72: ...Hold parts TP and RL flush and aligned 1 3 4 4 4 cm 1 3 4 4 4 cm x2 Glue RL TP TP Flush Flush Flush 3 7 6 cm Nails x12 RL 2 3 4 5 Assemble joist with 3 nails in a staggered pattern Turn assembled joi...

Страница 73: ...cm x2 Pre Assembled Loft Joist 7 8 9 Clamp or hold Pre Assembled Loft Joist in place flush under top plate Drill through joist and wall studs with 7 16 drill bit as shown Secure joist with hex bolts f...

Страница 74: ...xceed 400 lbs 181 kg evenly distributed across loft FINISH 11 You have finished installing your Loft 8 20 3cm 2 5 1 cm Nails Flush Flush 10 Install loft panel centered over loft joists Secure with 2 5...

Страница 75: ...Position and level collar tie on third rafter from loft HINT For best appearance install collar tie on rafter facing away from door opening Attach with 2 nails as shown You have finished installing y...

Страница 76: ...ate vent in the gable wall as shown You have finished installing your vents Secure using 1 2 5 cm screws x2 GABLE VENTS 15021 Repeat Steps 1 2 to install on the other gable wall 3 x8 8 x 1 2 5 cm Pan...

Страница 77: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Страница 78: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Страница 79: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Страница 80: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Страница 81: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Страница 82: ...between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Страница 83: ...t and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas Timber Buildings To validate your wa...

Отзывы: