54
PARTS REQUIRED:
EAVE SIDE SOFFITS
Position
72-3/4"
soffit boards
primed side down
flush to gable soffits and rafter ends
(Fig A)
.
Toenail at center seam
(Fig. C)
. Secure using eight 2" finish nails, two in each rafter.
Repeat Step 1
to attach eave side soffit boards on the opposite side.
Ensure soffit boards are flush at rafter ends (Fig. B) and flush at seams
.
x4
3/8 x 5-7/8 x 72-3/4" (1 x 14,9 x 184,8 cm)
x32
2" (5,1 cm)
2
1
BEGIN
You have finished installing your eave side soffit panels.
FINISH
3
Primed Side Down
Fig. A
2" (5,1 cm) Nails
x8 per board
Flush
Fig. B
Fig. C
Flush
Flush
TOENAILING
Содержание RIDGEMOOR GABLE 10 x 12
Страница 2: ...This page intentionally left blank...