22
153
.00
153.00
LAST PAGE
Hardware
Wood Parts
Fig. 7.6
32 x #8 x 1-3/4” Wood Screw
4 x (470) Rafter Brace
(To be used as
guides only in
this step)
Flush
F:
Make sure frame is square. Measurements to be as shown in fig. 7.6.
G:
In the two middle gaps between (468) Rafters place one (470) Rafter Brace flush to the top of (469) Rafter Top
Short and (467) Rafter Top. Use two 1/4 x 4-3/4” Hex Bolts per brace as a guide to line up the bolt holes. Attach
(470) Rafter Braces to (469) Rafter Top Short and (467) Rafter Top with eight #8 x 1-3/4” Wood Screws per brace.
Remove each Hex Bolt as they will be used in a later step and not installed here. (fig. 7.6 and 7.7)
H:
Repeat Steps A - G to create a second Roof Panel Frame.
Step 7: Frame Roof Panel
Part 3
#8 x 1-3/4
Wood Screws
x 8
Fig. 7.7
(467)
Rafter Top
(468)
Rafter
(468) Rafter
(468)
Rafter
(470) Rafter
Brace
1/4 x 4-3/4”
Hex Bolt
(469) Rafter
Top Short
(467)
Rafter Top
(469)
Rafter Top
Short
153”
(To be used as
guides only in
this step)
1/4 x 4-3/4”
Hex Bolt
(468) Rafter
#8 x 1-3/4
Wood Screws
x 8
Содержание CAROLINA
Страница 41: ...41 support yardistrystructures com NOTES...