![Yardistry CAROLINA Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/yardistry/carolina/carolina_installation-and-operating-instructions-manual_3180727016.webp)
16
Avery Inst 3 - Beam Assembly - Side
Hardware
24 x #8 x 2-1/2” Wood Screw
Fig. 4.3
Beam Inside
Assembly
Flush
Step 4: Beam Assembly - Side
Part 2
D:
Place one Beam Outside Assembly and one Beam Inside Assembly so the ends are flush. Match the bolt
holes in each (473) Inside End Beam with the bolt holes in each (475) Outside Beam. Attach assemblies with 12
#8 x 2-1/2” Wood Screws. (fig. 4.3)
E:
Repeat Step D one more time to make a second Beam Assembly - Side.
Flush
Beam Outside
Assembly
#8 x 2-1/2” Wood
Screws (x 12 per
assembly)
Match
bolt
holes
(475)
Outside
Beam
(473) Inside
Beam End
Match
bolt
holes
Hint: Use bolts at
both ends to line up
bolt holes. Remove
bolts once step is
complete
(473) Inside
Beam End
Содержание CAROLINA
Страница 41: ...41 support yardistrystructures com NOTES...