16
4. Operating procedures
Preparations
(
4
)
Insert the pipe in the center of the distributor and twist it all the way.
(
5
)
Install the container stand to the upper row of four taps at the front of the main unit with knurled
screws.
(
6
)
Install the drying chamber taking care to align the groove with the stage positioning pin.
Turn the POWER switch ON, raise the stage the stage with UP of the lift switch while holding the
driving chamber with hand. Stop moving the stage once when the upper part of the drying layer
chamber is close to the flange of the distributor, and then keep pushing the stage while turning
the UP switch ON and OFF until the stage is stopped.
(
7
)
Install the outlet temperature sensor into the pipe at the glass container connecting port and
insert the plug into the socket on the side of the main unit.
O-ring P110
Temperature se
nsor connection
Drying chamber
Container
pedestal
Stage positioning pin
Содержание PULVIS MINI BED GB210B
Страница 39: ...37 8 When a trouble occurs Confirmation of GB210A manual and language selection display ...
Страница 40: ...38 8 When a trouble occurs Confirmation of GB210A manual and language selection display ...
Страница 41: ...39 8 When a trouble occurs Confirmation of GB210B manual and language selection display ...
Страница 42: ...40 8 When a trouble occurs Confirmation of GB210B manual and language selection display ...