2-16
CABLE ROUTING DIAGRAM
SPEC
1
Clamp
2
High tension cord
3
C.D.I.unit
4
“ENGINE STOP” button lead
5
Ignition coil lead
6
Radiator hose
7
Radiator breather hose
8
Throttle cable
9
Clutch cable
0
Wireharness
A
Clamp the wireharness to the
right engine bracket.
B
Pass the high tension cord to
the right of the radiator hose.
C
Pass the C.D.I. unit lead
between the frame and the right
side of the radiator and then
above the radiator fitting boss.
D
Pass the radiator breather hose
behind the radiator hose.
E
Locate the clamp ends in the
arrowed range.
F
Insert the C.D.I. unit band until it
stops at the C.D.I. unit stay.
1P8-28199-10 48
04.6.16, 2:31:21 PM
Содержание YZ250T1
Страница 1: ...OWNER S SERVICE MANUAL YZ250T1 1P8 28199 10 LIT 11626 18 34 ...
Страница 2: ......