CHASSIS
3-29
b. Turn the adjusting ring “3” in direction “a” or
“b”.
c. Tighten the locknut to specification.
CAUTION:
ECA13600
Always tighten the locknut against the ad-
justing nut and torque it to specification.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EAS21650
CHECKING THE TIRES
The following procedure applies to both of the
tires.
1. Check:
• Tire pressure
Out of specification
→
Regulate.
WARNING
EWA13180
• The tire pressure should only be checked
and regulated when the tire temperature
equals the ambient air temperature.
• The tire pressure and the suspension must
be adjusted according to the total weight
(including cargo, rider, passenger and ac-
cessories) and the anticipated riding
speed.
• Operation of an overloaded vehicle could
cause tire damage, an accident or an injury.
NEVER OVERLOAD THE VEHICLE.
Direction “a”
Spring preload is increased (suspen-
sion is harder).
Direction “b”
Spring preload is decreased (suspen-
sion is softer).
Spring preload adjusting posi-
tions
Installed spring length
Minimum
XV19S(C)/ XV19M(C)/
XV19CTS(C)/ XV19CTM(C):
162.0 mm (6.38 in)
XV19CS(C)/ XV19C(C):
163.0 mm (6.42 in)
Standard
XV19S(C)/ XV19M(C):
171.0 mm (6.73 in)
XV19CTS(C)/ XV19CTM(C):
165.0 mm (6.50 in)
XV19CS(C)/ XV19C(C):
172.0 mm (6.77 in)
Maximum
XV19S(C)/ XV19M(C)/
XV19CTS(C)/ XV19CTM(C):
171.0 mm (6.73 in)
XV19CS(C)/ XV19C(C):
172.0 mm (6.77 in)
c. Installed spring length
1
a
b
T
R
.
.
Locknut (rear shock absorber
spring preload adjusting nut)
30 Nm (3.0 m·kg, 22 ft·lb)
Содержание XV19SX(C)
Страница 6: ......
Страница 8: ......
Страница 46: ...ELECTRICAL SPECIFICATIONS 2 19 Spare fuse 3 0 A...
Страница 52: ...TIGHTENING TORQUES 2 25 Cylinder head tightening sequence 3 1 2 4 A B 3 1 2 4 A Front cylinder B Rear cylinder...
Страница 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 36...
Страница 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 D D B B D D C C A A B C C B 3 2 1 3 4 6 7 6 7 5...
Страница 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 43 A A A A 1 3 2 4...
Страница 71: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 44 1 Oil pipe 1 2 Oil pump 3 Oil strainer crankcase 4 Joint pipe...
Страница 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 45 A 1 2 3 4...
Страница 74: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 47 A A A 1 5 5 1 3 2 4 B B B B...
Страница 76: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 49 1 2...
Страница 77: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 50 1 Transfer gear oil pump 2 Middle driven shaft...
Страница 110: ...CABLE ROUTING for XV19CS C XV19C C 2 83...
Страница 113: ......
Страница 149: ...ELECTRICAL SYSTEM 3 36 A For XV19S C XV19M C XV19CTS C XV19CTM C B For XV19CS C XV19C C a b 1 A b a B 1...
Страница 150: ...ELECTRICAL SYSTEM 3 37...
Страница 179: ...FRONT WHEEL 4 26...
Страница 218: ...HANDLEBAR 4 65 Throttle cable free play 4 0 6 0 mm 0 16 0 24 in...
Страница 330: ...GENERATOR AND STARTER CLUTCH 5 81...
Страница 368: ...TRANSMISSION 5 119...
Страница 391: ......
Страница 397: ...IGNITION SYSTEM 7 6...
Страница 405: ...CHARGING SYSTEM 7 14 1 AC magneto 2 Rectifier regulator 4 Main fuse 6 Battery...
Страница 407: ...CHARGING SYSTEM 7 16...
Страница 458: ...ELECTRICAL COMPONENTS 7 67 EAS27970 ELECTRICAL COMPONENTS 13 3 6 9 10 12 4 11 14 15 5 2 1 7 8 16...
Страница 460: ...ELECTRICAL COMPONENTS 7 69 16 18 2 11 13 9 8 10 12 14 15 17 1 3 4 5 6 7...
Страница 490: ......
Страница 491: ......
Страница 492: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...