
3-38
CHK
ADJ
9. Fill:
8
coolant reservoir
(with the recommended coolant to the
maximum level mark
a
)
10.Install:
8
coolant reservoir cap
11.Start the engine, warm it up for several min-
utes, and then stop it.
12.Check:
8
coolant level
Refer to “CHECKING THE COOLANT
LEVEL”.
NOTE:
Before checking the coolant level, wait a few
minutes until the coolant has settled.
13. Install:
8
radiator cover
Refer to “COOLING SYSTEM”in chap-
ter 6.
8
footrest board side cover mole (right)
8
battery cover
8
mat
Refer to “COVER AND PANEL”.
CHANGING THE COOLANT
Содержание VINO XC50V
Страница 1: ...XC50V SERVICE MANUAL LIT 11616 19 49 3D1 F8197 10 ...
Страница 298: ...YAMAHA MOTOR TAIWAN CO LTD ...