
ENG
5-45
BELT DRIVE
T
R
.
.
3. Install:
8
clutch housing
1
8
secondary sheave nut
2
40 Nm (4.0 m • kg, 28.9 ft • lb)
NOTE:
Tighten the secondary sheave nut with the
sheave holder
3
.
Sheave holder
90890-01701 (YS-01880-A)
4. Install:
8
primary fixed sheave
1
8
primary sheave nut
2
30 Nm (3.0 m• kg, 21.7 ft• lb)
NOTE:
While holding the primary fixed sheave with the
rotor holding tool
3
, tighten the primary fixed
sheave nut.
5. Position:
8
V-belt
1
NOTE:
Position the V-belt in the primary sheave
2
(when the pulley is at its widest position) and in
the secondary sheave
3
(when the pulley is at
its narrowest position), and make sure the V-
belt is tight.
T
R
.
.
2
1
3
Содержание VINO XC50V
Страница 1: ...XC50V SERVICE MANUAL LIT 11616 19 49 3D1 F8197 10 ...
Страница 298: ...YAMAHA MOTOR TAIWAN CO LTD ...