
CHAS
4-28
HANDLEBAR
T
R
.
.
EAS00673
INSTALLING THE HANDLEBAR
1. Stand the scooter on a level surface.
w
Securely support the scooter so that there
is no danger of it falling over.
2. Install:
8
handlebar
1
NOTE:
Align the slot
a
on the handlebar with the steer-
ing shaft
2
surface.
3. Tighten:
8
handlebar
60 Nm (6.0 m • kg, 43.4 ft • lb)
c
C
There must be a space
b
b
b
b
b
after tighting bolt.
4. Install:
8
handlebar upper cover
5. Install:
8
handlebar holder assembly ( left )
1
NOTE:
Align the projection
a
on the handlebar holder
assembly ( left ) with the hole
b
on the handle-
bar.
6. Install:
8
throttle grip assembly
1
8
handlebar holder assembly (right)
2
8
throttle cable kit
3
1
a
b
2
RIGHT
LEFT
FORWARD
1
a
b
2
b
1
a
Содержание VINO XC50V
Страница 1: ...XC50V SERVICE MANUAL LIT 11616 19 49 3D1 F8197 10 ...
Страница 298: ...YAMAHA MOTOR TAIWAN CO LTD ...