2 - 26
SPEC
CABLE ROUTING DIAGRAM
1
Air vent hose
2
Spark plug lead
3
Starter cable
4
Throttle cable
5
Clutch cable
6
Clamp
7
Cable guide
8
Engine oil breather hose
9
Overflow hose
Å
After clamping the starter cable, push it against the starter plunger.
ı
Put the tip of the air vent hose into the main pipe.
Ç
Install the primary coil terminal (orange) to the ignition coil.
Î
Fasten the ground lead together with the ignition coil.
‰
Pass the clutch cable on the inside of the throttle and starter cable.
Ï
Clamp the clutch cable with the paint in the cable guide bottom recess.
Ì
Pass the throttle cable and starter cable into the cable guide.
Ó
Pass the engine oil breather hose and overflow hose between the right
half of the swingarm and pillar tube.
È
Clamp the engine oil breather hose, overflow hose and air vent hose to
2 clicks.
Содержание TT-R125(R) 2002
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 47: ...GEN INFO MEMO...
Страница 157: ...INSP ADJ MEMO...
Страница 254: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 501: ...ELEC MEMO...
Страница 508: ......
Страница 509: ......
Страница 510: ...PRINTED IN JAPAN 2002 04 1 2 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...