4-16
ENG
CYLINDER HEAD
c
d
8. Check:
9
“I” mark
a
Align the “I” mark on the generator rotor
with the stationary pointer
b
on the crank-
case.
9
“I” mark
c
Align the “I” mark on the camshaft sprocket
with the stationary pointer
d
on the cylinder
head.
Out of alignment
→
Correct.
Refer to the installation steps above.
9. Measure:
9
valve clearance
Out of specification
→
Adjust.
Refer to “ADJUSTING THE VALVE
CLEARANCE” in chapter 3.
10. Install:
9
camshaft sprocket cover screws
9
camshaft sprocket cover
11. Install:
9
tappet cover (exhaust side)
9
tappet cover (intake side)
12. Install:
9
spark plug
13. Install:
9
intake manifold bolts
9
intake manifold
14. Connect:
9
air induction system pipe bolts
9
air induction system pipe
7 Nm (0.7 m•kg, 5.0 ft•lb)
18 Nm (1.8 m•kg, 13 ft•lb)
12.5 Nm (1.25 m•kg, 9.0 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
23 Nm (2.3 m•kg, 17 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
3S3-F8197-E0_4_1 05.11.18 13:15 Page 16
Содержание Sirius T110LSE
Страница 1: ...T110LE T110LSE SERVICE MANUAL 3S3 F8197 E0 ...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 12: ...GEN INFO ...
Страница 22: ...SPEC ...
Страница 99: ...ENG ...
Страница 179: ...ENG 4 80 ...
Страница 181: ...CARB ...
Страница 261: ...ELEC ...
Страница 265: ...ELEC CHECKING SWITCH CONTINUITY 7 4 ...
Страница 301: ...TRBL SHTG ...
Страница 303: ...TRBL SHTG TROUBLESHOOTING 8 2 COMPRESSION SYSTEM ...
Страница 305: ...TRBL SHTG ...
Страница 306: ......
Страница 307: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...