5-1
POWR
E
ENGINE UNIT
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
ENGINE UNIT REMOVAL
Follow the left “Step” for removal.
Battery box
Refer to “BATTERY BOX” in chapter 8.
YPVS cables and YPVS
servomotor
Refer to “YPVS SERVOMOTOR” in
chapter 7.
Intake silencer
Refer to “INTAKE SILENCER” in
chapter 4.
Choke cable, throttle cable and
fuel hoses
Refer to “CARBURETOR UNIT” in
chapter 4.
1
Coupler
3
2
Band
6
3
Clamp/Cooling water hose
1
ENGINE UNIT
Содержание GP800R WaveRunner 2003
Страница 1: ... LIT186160226 WaveRunner GP800R SERVICEMANUAL F0W 28197 1A 11 LIT 18616 02 26 ...
Страница 8: ......
Страница 16: ......
Страница 30: ......
Страница 49: ......
Страница 149: ......
Страница 189: ......
Страница 227: ...8 36 E HULL HOOD SEATS AND HAND GRIP SERVICE POINTS Seat lock inspection 1 Inspect Seat lock Damage wear Replace ...
Страница 241: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ......
Страница 245: ......
Страница 246: ...YAMAHA MOTOR CORPORATION USA Printed in USA Nov 2000 1 CR F0W 28197 1A 11 GP800A ...