5-16
POWR
E
YPVS
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
8
Bolt
2
NOTE:
During installation, align the hole
a
in
the YPVS shaft with the bolt.
9
Shaft 2
1
10
Shaft 1
1
11
YPVS valve lever
2
12
Bolt
2
13
YPVS valve assembly
2
14
Oil seal
4
NOTE:
If the YPVS shaft is removed, the oil seal
must be replaced.
Reverse the removal steps for installation.
Содержание GP800R WaveRunner 2003
Страница 1: ... LIT186160226 WaveRunner GP800R SERVICEMANUAL F0W 28197 1A 11 LIT 18616 02 26 ...
Страница 8: ......
Страница 16: ......
Страница 30: ......
Страница 49: ......
Страница 149: ......
Страница 189: ......
Страница 227: ...8 36 E HULL HOOD SEATS AND HAND GRIP SERVICE POINTS Seat lock inspection 1 Inspect Seat lock Damage wear Replace ...
Страница 241: ...E 1 2 3 4 5 6 7 8 9 TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 244: ......
Страница 245: ......
Страница 246: ...YAMAHA MOTOR CORPORATION USA Printed in USA Nov 2000 1 CR F0W 28197 1A 11 GP800A ...