CABLE ROUTING (FJR1300AS)
2-66
1. Right grip warmer lead
2. Brake hose (front brake master cylinder to brake
pipe/lower joint assembly)
3. Right handlebar switch lead
4. Left handlebar switch lead
5. Left grip warmer lead
6. Hand shift switch lead
7. Main switch lead
8. Immobilizer unit lead
9. Left horn (low)
10. Brake hose (brake pipe/upper joint assembly to left
front brake caliper)
11. Front wheel sensor lead
12. Brake hose (brake pipe/upper joint assembly to
right front brake caliper)
13. Brake hose (metering valve to right front brake
caliper)
14. Brake hose (brake pipe/upper joint assembly to
front brake calipers)
15. Right horn (high)
16. Headlight (on/off)/grip warmer relay
17. Radiator fan motor relay
18. Main fuse
19. Positive battery lead
20. ABS test coupler
21. Throttle cable (accelerator cable)
22. Throttle cable (decelerator cable)
A. Route the right handlebar switch lead and right
grip warmer lead under the handlebar.
B. Route the left handlebar switch lead, left grip
warmer lead, and hand shift switch lead under the
handlebar.
C. Pass the hand shift switch lead, right grip warmer
lead, left grip warmer lead, right handlebar switch
lead, and left handlebar switch lead through the
guide.
D. Fasten the right handlebar switch lead, right grip
warmer lead, main switch lead, and immobilizer
unit lead with a plastic locking tie. Face the end of
the plastic locking tie downward, angled inward,
and then cut off the excess end of the tie.
E. Temporarily tighten the brake hose joint bolt, union
bolt, and brake hose holder bolt in the proper
tightening sequence as shown. Then, tighten the
bolts to the specified torque, making sure to tighten
the brake hose joint bolt “1” last.
F. To front cowling wire harness
G. Install the horn L-shaped connectors so that the
leads are routed outward.
H. Fasten the grommet on the front wheel sensor lead
with the holder.
I.
Connect the coupler that has blue tape wrapped
around its leads to the radiator fan motor relay.
J. Install the ABS test coupler completely onto the
tab on the battery stay.
K. Pass the brake hose (front brake master cylinder to
brake pipe/lower joint assembly), right handlebar
switch lead, right grip warmer lead, and throttle
cables through the guide as shown in the
illustration.
L. Fasten the right grip warmer lead to the throttle
cables with a plastic locking tie 10 mm (0.39 in) or
less from the end of the throttle cable boot. Face
the end of the plastic locking tie upward or
downward, and then cut off the excess end of the
tie.
Содержание FJR1300A(X)
Страница 1: ...2008 SERVICE MANUAL FJR1300A X FJR1300AS X 3P6 28197 E2 ...
Страница 6: ......
Страница 8: ......
Страница 50: ...SPECIAL TOOLS 1 41 ...
Страница 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Страница 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 3 2 ...
Страница 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Страница 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 6 5 4 3 2 1 ...
Страница 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 2 3 4 5 6 7 8 9 ...
Страница 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 4 5 3 2 1 9 8 6 7 ...
Страница 94: ...COOLING SYSTEM DIAGRAMS 2 43 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Страница 100: ...CABLE ROUTING FJR1300A 2 49 2 3 4 5 6 7 8 9 11 10 12 13 14 15 16 A B C D E F 1 1 ...
Страница 102: ...CABLE ROUTING FJR1300A 2 51 1 2 3 4 5 6 7 8 A B C D E 9 10 11 12 13 ...
Страница 110: ...CABLE ROUTING FJR1300A 2 59 1 2 3 4 A B B C D E ...
Страница 112: ...CABLE ROUTING FJR1300A 2 61 A 1 13 A A B P O C D E F G H I J K L M N 2 3 4 5 6 7 8 9 10 11 12 A ...
Страница 120: ...CABLE ROUTING FJR1300AS 2 69 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 A B C E D F 1 1 H 10 18 G ...
Страница 122: ...CABLE ROUTING FJR1300AS 2 71 1 2 3 4 5 6 7 8 A B C D E 9 10 11 12 13 ...
Страница 130: ...CABLE ROUTING FJR1300AS 2 79 1 4 2 5 6 A B C D D E 3 F G ...
Страница 132: ...CABLE ROUTING FJR1300AS 2 81 A 1 13 A A B P O C D E F G H I J K L M N 2 3 4 5 6 7 8 9 10 11 12 A ...
Страница 136: ...CABLE ROUTING FJR1300AS 2 85 ...
Страница 139: ......
Страница 198: ...GENERAL CHASSIS 4 11 b a 1 2 ...
Страница 317: ...ENGINE REMOVAL 5 12 3 Check Gear position setting Refer to Diagnostic code table Diagnostic code No Sh_ _65 1 2 3 ...
Страница 326: ...CAMSHAFTS 5 21 ...
Страница 420: ...CONNECTING RODS AND PISTONS 5 115 ...
Страница 458: ...WATER PUMP 6 15 ...
Страница 468: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Страница 477: ......
Страница 489: ...IGNITION SYSTEM 8 12 ...
Страница 505: ...ELECTRIC STARTING SYSTEM 8 28 ...
Страница 507: ...CHARGING SYSTEM 8 30 2 Rectifier regulator 3 AC magneto 8 Main fuse 9 Battery ...
Страница 509: ...CHARGING SYSTEM 8 32 ...
Страница 533: ...COOLING SYSTEM 8 56 ...
Страница 581: ...FUEL PUMP SYSTEM 8 104 ...
Страница 591: ...ACCESSORY BOX SYSTEM 8 114 54 Coupler 4 wire harness front cowling wire harness 80 Accessory box solenoid ...
Страница 593: ...ACCESSORY BOX SYSTEM 8 116 ...
Страница 604: ...IMMOBILIZER SYSTEM 8 127 a Light on b Light off ...
Страница 605: ...IMMOBILIZER SYSTEM 8 128 ...
Страница 615: ...ABS ANTI LOCK BRAKE SYSTEM 8 138 ...
Страница 702: ...ELECTRICAL COMPONENTS 8 225 EAS27970 ELECTRICAL COMPONENTS FJR1300A 1 18 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 704: ...ELECTRICAL COMPONENTS 8 227 FJR1300A 5 1 3 2 17 8 10 11 12 13 14 15 16 7 6 4 9 ...
Страница 706: ...ELECTRICAL COMPONENTS 8 229 FJR1300AS 13 16 18 17 2 3 4 5 6 7 8 1 9 10 11 12 15 14 19 ...
Страница 708: ...ELECTRICAL COMPONENTS 8 231 FJR1300AS 1 19 3 2 5 7 9 8 12 13 14 15 16 11 10 18 17 6 4 ...
Страница 736: ...ELECTRICAL COMPONENTS 8 259 ...
Страница 745: ......
Страница 746: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...