Rigging information
3-13
RIG
GING
4.
Connect the gauge harness
6
to the
coupler
b
. (R model)
5.
Route the battery cable
7
, 10-pin main
wiring harness
8
, and gauge harness
6
(R model) into the grommet
9
. Then fas-
ten the battery cable with the plastic tie
0
(H model).
å
H model
∫
R model
Control cable installation
Installing the shift cable (rod) and
throttle cable
1.
Install the grommet
1
onto the shift
cable (rod)
2
and throttle cable
3
, and
install the cable guide
4
to the groove of
the shift cable
2
(R model) and throttle
cable
3
. Then install them to the bottom
cowling.
4
1
3
5
2
a
6
b
7
6
8
9
7
8
9
å
∫
8
9
7
0
å
1
2
3
4
å
Содержание F50D
Страница 4: ......
Страница 20: ...General information 0 15 GEN INFO MEMO ...
Страница 38: ...Specification 1 17 SPEC MEMO ...
Страница 56: ...Technical features and description 2 17 TECH FEA MEMO ...
Страница 88: ...Troubleshooting 4 9 TRBL SHTG MEMO ...
Страница 120: ...Electrical system 5 31 ELEC MEMO ...
Страница 166: ...Power unit 7 25 POWR Exhaust cover bolt 4 1st 6 N m 0 6 kgf m 4 4 ft lb 2nd 12 N m 1 2 kgf m 8 9 ft lb UP ...
Страница 226: ...Lower unit 8 27 LOWR Shim location T2 T1 T3 ...
Страница 269: ...8 70 0 1 2 3 4 5 6 7 8 9 10 A Shim location T1 T3 Shimming FT50C ...
Страница 334: ...Bracket unit 9 55 BRKT MEMO ...
Страница 364: ......
Страница 372: ......