SPEC
12
EAS00035
CABLE ROUTING
Ground lead
Meter lead
Stay 1
Auxiliary light lead (right)
Headlight lead
Auxiliary light lead (left)
Console panel 1
Duct 1
Console panel 2
Duct 2
Headlight lead (right)
Headlight lead (left)
Insert to the rib of the head
light. (Either location of the right
and left relays is acceptable.)
The lead should not stretch too
much.
Direction of the ground terminal
can be either top side or flip
side.
Make sure to insert the coupler
and boot to the stay 1 hole.
The speedometer lead should
not be strained.
To the stay 1 hole
Connect after passing over the
upper side of the duct.
Clamp the head light lead by
wrapping and insert it to the
intake air grill hole. (only at the
right side.)
Do not connect the wire to the
coupler with the plug for
options.
To the turn signal light
To the wire harness
Cut the tip of the clamp.
Clamp the headlight lead to the
positioning white tape section.
CABLE ROUTING
Содержание 2006 YSF-R1(V)
Страница 1: ...2006 YZF R1 V 5VY 28197 E2 SUPPLEMENTARY SERVICE MANUAL YZF R1S V ...
Страница 2: ......
Страница 19: ...SPEC 11 LUBRICATION DIAGRAMS Main axle Oil delivery pipe Drive axle LUBRICATION DIAGRAMS ...
Страница 85: ......
Страница 86: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...