5.
Check that the scale
c
on the flywheel
magnet is advances to specified position,
when the throttle is fully opened.
6.
If the ignition timing is out of specification,
refer to “Adjusting the timing plate”
P5-52 and “Adjusting the ignition timing
stopper” P5-53.
Checking the choke solenoid
(E, ET)
1.
Check that the choke solenoid face
a
is
between the line
b
on the plunger. Adjust
the position of the choke solenoid to
loosen the bolt
1
if necessary.
3.
Attach the special service tool
3
to spark
plug wire #1
2
, and then start the
engine. Cheek the engine idle speed and
ignition timing.
4.
Check that the ATDC 5° scale
a
on the
flywheel magnet is aligned with the point-
er
b
on the timing plate, when the throt-
tle is fully closed.
61U30250
2
3
CHK
ADJ
3-9
61U5H11
Periodic check and adjustment
a
b
1
61U30120
Timing light
3
: 90890-03141
Timing plate position:
ATDC 4–6°
10
TDC
10
a
b
61U30260
20
30
c
61U30270
Timing plate position:
E115A:
BTDC 22–24°
115B:
BTDC 24–26°
140B:
BTDC 21–23°
Engine idle speed:
700–800 r/min
Engine speed (throttle fully opened):
5,500 r/min
61U5H11_03 05.10.13 11:43 AM Page 10
Содержание 115B
Страница 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Страница 4: ......
Страница 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Страница 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Страница 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Страница 255: ......
Страница 256: ...YAMAHA MOTOR CO LTD Printed in Japan Oct 2005 1 2 1 E_1 Printed on recycled paper E115A 115B 140B ...