61U5H11
3-8
9
8
7
6
5
4
3
2
1
4.
Make sure to align the center of the set
pin
a
on the shift lever with the align-
ment mark
b
on the bottom cowling.
5.
Adjust the position of the shift cable joint
3
until its hole is aligned with the set pin
4
.
w
The shift cable joint must be screwed in a
minimum of 8.0 mm (0.31 in)
c
.
a
b
61U30230
6D430226
c
Control system
6.
Install the shift cable joint
3
, install the
clip
2
, and then tighten the locknut
1
.
7.
Check the gear shift for smooth operation
and adjust the shift cable length, if nec-
essary, repeat the steps 3–6.
8.
Check that the neutral switch
5
is push-
ing by the shift lever
6
. (WH)
Checking the ignition timing
1.
Start the engine and warm it up for 5 min-
utes.
NOTE:
Turn off the engine when warmed it up com-
pletely.
2.
Attach the special service tool
1
to spark
plug wire #1
2
.
1
3
2
61U30100
3
4
61U30106
5
6
61U30240
F
N
R
Digital tachometer
1
: 90890-06760
1
2
61U30040
61U5H11_03 05.10.13 11:43 AM Page 9
Содержание 115B
Страница 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Страница 4: ......
Страница 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Страница 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Страница 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Страница 255: ......
Страница 256: ...YAMAHA MOTOR CO LTD Printed in Japan Oct 2005 1 2 1 E_1 Printed on recycled paper E115A 115B 140B ...