background image

 

1)

 

Install the hose union and material hose (separately available) to 
the material discharge port (Rc3/4) of the pump. Tighten the hose 
union with a spanner so as not to make the material hose loose. In 
this case, wind the seal tape that is available on the market 
around the male screw of the hose and then screw it. 

 
2)

 

Install a valve between the end of the hose and the piping. (Fig. 4) 

 
3)

 

Be sure to install a relief valve so that leak may not be caused to 
the piping or damage may not be given to the hose connecting 
portion by the liquid pressure increased by temperature changes 
in the piping. The relief valve should be installed near the pump. 

 
 

3.5 Air Connection 

1)

 

Install the air regulator (separately available) at the air supply port of the pump. The dedicated air 
regulator is available as the standard product. Please use it. 

 
2)

 

Connect the air hose from the compressor to the IN side of the air regulator. 

 

CAUTION 

-  Be sure to install the air regulator at the air supply port for the safe use of the pump. 

(The air regulator consists of a reducing valve and a pressure gauge.) 

 
<NOTE> 
-  When air is supplied to the air hose, the pump is in operation. 

Before connecting the air hose, be sure to turn the knob of the air regulator counterclockwise to reset 
the pointer of the pressure gauge to “0”. 

-  Using the air regulator permits adjusting the supply air pressure to the pump and reducing the 

wasteful motion of the pump, with the result that the operability is improved and the pump life is 
extended. 
Regarding the method of adjusting the air pressure with the air regulator, the pressure is increased 
by turning the knob clockwise (the pointer of the pressure gauge gradually raises from “0”) and 
reduced by turning it counterclockwise (the pointer of the pressure gauge goes back to “0”). 
In the normal operating status, the pointer of the pressure gauge should be at 0.3 - 0.5 MPa. 

 
 

3.6 Connecting the ground wire 

WARNING 

-  Make ground connection when working with flammable material or in explosive atmosphere. 

Rapid pumping of material can result in static electrical charge. Also, be sure to provide proper 
ventilation where a flammable atmosphere may exist. 

1) When installing the pump, be sure to connect the ground 

wire at the specified position.   

2) Also connect ground wires to peripheral equipment and piping. 
3) Use 2.0mm

2

 minimum ground wire. 

 

 

 
 
 

 

Pump 

Piping 

Valve 

Material 
hose 

Air hose  Air regulator 

Fig. 4 

Position for connecting the ground wire 

Содержание SH-110A5

Страница 1: ...OIL PUMP SH 110A5 ITEM No 851753 DR 110A5 ITEM No 851754 PD 110A5 ITEM No 851755 WARNING Prior to operating this pump be sure to read this operation manual for safety After reading the manual please...

Страница 2: ......

Страница 3: ......

Страница 4: ...by symbols These symbols are for those who will operate this product and for those who will be nearby for safe operation and for prevention of personal injury and property damage The following warnin...

Страница 5: ...tion Attach a valve for stop in emergency or regulator to the air supply pipe to keep supply air pressure under 0 7 MPa Discontinue it when you feel a hazard or abnormality during the work And corresp...

Страница 6: ...alling the pump Back injury may be caused by lifting the pump Do not touch the surfaces of the pump and the hose when pumping high temperature material Risk of burns exists Stop the air supply source...

Страница 7: ...he Drum Pump 2 3 2 Installing the Siphon Pump 3 3 3 Installing the Draw Change Material Hose 3 3 4 Installing the Pressure Feed Material Hose 3 3 5 Air Connection 4 3 6 Connecting the ground wire 4 4...

Страница 8: ...acked in a corrugated fiberboard case Please make sure no damage during shipment and no missing accessories after unpacking as soon as possible Please make sure no loose screws piping connections and...

Страница 9: ...ling tapes to the male screws and tighten tightly when the pipes are connected Be careful not to allow the sealing materials to enter the piping Do not apply the tip of the terminal two thread ridges...

Страница 10: ...rew of the bang adapter to fix the suction hose assembly Fig 2 3 3 Installing the Draw Change Material Hose 1 Install the material hose separately available at the material discharge port Rc3 4 of the...

Страница 11: ...hose the pump is in operation Before connecting the air hose be sure to turn the knob of the air regulator counterclockwise to reset the pointer of the pressure gauge to 0 Using the air regulator perm...

Страница 12: ...replace the drum can with a new one For replacing the drum can observe the item pertaining to 3 1 Installing the Drum Pump The distance for pressure feed differs depending on the viscosity temperature...

Страница 13: ...oil does not leak at the exhaust port Check if there is any open valve on the material output side The air motor is faulty Ask for servicing the air motor When the outlet side is closed check if any l...

Страница 14: ...regulator 2 Inject a few drops of lubricating oil approx 0 5 mL into the air supply port as shown in the figure at right Use turbine oil class 1 ISO VG 32 or equivalent as the lubricating oil 5 3 Cons...

Страница 15: ...od of A weighted sound power level is based on ISO 3744 3 Discharge volume per cycle varies according to use conditions MAXIMUM OPERATING NOISE 5 x 1 TYPE ITEM No PUMP RATIO NOMINAL FLUID CONNECTION O...

Страница 16: ...753 SH 110A5 type Panel Unit 850126 Suction Hose Assembly No Parts No Descriptions Q ty 1 801102 Delivery hose assembly 1 2 805062 Panel option 1 3 802558 Air regulator assembly 1 4 800400 Mounting br...

Страница 17: ...cause corrosion inflation or dissolution of the component parts of the product 4 Irregularity arising from repair made by other than by our firm our regional office dealer or authorized service perso...

Страница 18: ...MEMO...

Страница 19: ......

Страница 20: ...FAX 31 0 74 242 1055 E mail sales yamada nl Web www yamada europe com Manufactured by YAMADA CORPORATION INTERNATIONAL DEPARTMENT 1 1 3 Minami Magome Ota ku Tokyo 143 8504 Japan PHONE 81 0 3 3777 0241...

Отзывы: